My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02778 <br /> HIGH DENSITY POLYETHYLENE(HDPE)GEOMEMBRANE <br /> PART GENERAL <br /> 1.1 WORK INCLUDED <br /> A. This section covers the Work necessary to furnish and install 60-mil single-sided <br /> textured high density polyethylene (HDPE) geomembrane liner, complete. <br /> B. The GEOSYNTHETICS CONTRACTOR shall furnish all labor,supervision,tools, <br /> equipment,and materials necessary to complete the HDPE geomembrane installation <br /> including,but not limited to, submittals,panel layout,seaming,patching,temporary <br /> anchorage,temporary slip sheeting,and all necessary and incidental items required to <br /> complete the Work in accordance with these Specifications and the Construction <br /> Drawings. The EARTHWORK CONTRACTOR will perform excavation and <br /> backfilling of anchor trenches and will unload the HDPE geomembrane if the <br /> GEOSYNTHETICS CONTRACTOR is not onsite. <br /> C. A leak location test will be performed on the primary geomembrane following <br /> deployment, seaming, and placement of the safety ladders and gravel logs. The <br /> GEOSYNTHETICS CONTRACTOR shall be responsible for repairing all identified <br /> leaks in the geomembrane in accordance with the applicable Specifications sections. <br /> 1.2 REFERENCES <br /> A. American Society for Testing and Materials (ASTM): <br /> 1. D638, Standard Test Method for Tensile Properties of Plastics. <br /> 2. D746, Standard Test Method for Brittleness Temperature of Plastics and <br /> Elastomers by Impact. <br /> 3. D792, Standard Test Methods for Specific Gravity and Density of Plastics by <br /> Displacement. <br /> 4. D 1004,Standard Test Method for Initial Tear Resistance of Plastic Film and <br /> Sheeting. <br /> 5. D 1204, Standard Test Method for Linear Dimensional Changes of Nonrigid <br /> Thermoplastic Sheeting or Film at Elevated Temperature. <br /> 6. D 123 8,Standard Test Method for Flow Rates of Thermoplastics by Extrusion <br /> Plastometer. <br /> 7. D 1505,Standard Test Method for Density of Plastics by the Density-Gradient <br /> Technique. <br /> 8. D1603, Standard Test Method for Carbon Black in Olefin Plastics. <br /> 9. D 1693,Standard Test Method for Environmental Stress Cracking of Ethylene <br /> Plastics. <br /> 10. D3015, Standard Pratice for Microscopical Examination of Pigment <br /> Dispersion in Plastic Compounds. <br /> 11. D3895, Standard Test Method for Copper-Induced Oxidative Induction Time <br /> of Polyolefins by Thermal Analysis. <br /> 12. D4218, Test Method for Determination of Carbon Black Content in <br /> Polyethylene Compounds by the Muffle-Furnace Technique. <br /> Forward Compost Facility Stormwater Improvements Is <br /> 02778 1 HDPE GEOMEMBRANE <br />
The URL can be used to link to this page
Your browser does not support the video tag.