Laserfiche WebLink
3.9 PRODUCT PROTECTION <br /> A. The GEOSYNTHETICS CONTRACTOR shall use all means necessary to protect <br /> all prior work and materials and completed work of other Sections. <br /> B. In the event of damage,the GEOSYNTHETICS CONTRACTOR shall immediately <br /> make all repairs and replacements necessary, to the approval of the QA/QC <br /> CONSULTANT and at no additional cost to the OWNER. <br /> 3.10 ACCEPTANCE <br /> A. GEOSYNTHETICS CONTRACTOR shall retain ownership and responsibility <br /> for GCL until accepted by OWNER. <br /> B. OWNER will accept GCL when all of the following conditions are met: <br /> 1. The installation is complete. <br /> 2. Required documentation is complete. <br /> 3. The QA/QC CONSULTANT's final report is complete. <br /> 4. Verification of the adequacy of all seams and repairs, including associated <br /> testing, is completed. <br /> 5. Written certification documents have been received by the QA/QC <br /> CONSULTANT and OWNER. <br /> PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT <br /> AND PAYMENT PROCEDURES) <br /> END OF SECTION <br /> FORWARD COMPOST FACILITY STORMWATER IMPROVEMENTS GEOSYNTHETC <br /> 02777 9 CLAY LINER <br />