My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Copy of quality control certificates issued by manufacturer. <br /> 5. Test reports from the manufacturer. <br /> 6. Certification stating that the extrudate bead or rod resin is the same type, <br /> from the same manufacturer and compatible with the resin used to <br /> manufacture the geomembrane supplied for this project. <br /> C. Schedules and Drawings. <br /> 1. Submit installation schedule 2 weeks prior to installation. Include hours to be <br /> worked per day, week and shift. Indicate all weather delay built into <br /> schedule. <br /> 2. Submit installation layout drawings 2 weeks prior to installation of <br /> geomembrane, submit drawings showing the panel layout indicating both <br /> fabricated (if applicable) and field seams,and details not conforming to the <br /> Contract Drawings. Upon acceptance,use these drawings for installation of <br /> geomembrane. <br /> D. Field Quality Control Documents <br /> 1. Submit quality control documentation prepared during installation. Submit <br /> no later than 1 week following completion of work. <br /> 2. Submit daily prior to the start of installation,subgrade acceptance certificate <br /> signed by the installation supervisor for each area to be covered by the <br /> geomembrane. Allow QA/QC CONSULTANT time to inspect certified area. <br /> E. Equipment: Submit the following 2 weeks prior to installation: <br /> 1. Equipment list stating quantity, types, model numbers, calibration <br /> certificates, and maintenance requirements. <br /> F. Submit upon completion of the installation: <br /> 1. Certificate stating the liner has been installed in accordance with the plans <br /> and specifications. <br /> 2. The warranty obtained from the manufacturer/fabricator and the installation <br /> warranty. <br /> 3. As-built drawings showing locations of panels, seams,repairs,patches,and <br /> destructive samples, including measurements. <br /> 4. Copies of seam test results. <br /> G. Submit a continuous length of each type of geomembrane measuring 50 feet by the <br /> roll width taken from certified and approved geomembrane rolls delivered to the <br /> Project site. The geomembrane samples submitted shall be labeled with the product <br /> identification, lot number, and roll number. <br /> 1.5 QUALIFICATIONS <br /> A. Master Welder Qualifications: Must have completed a minimum of 5,000,000 square <br /> feet of polyethylene geomembrane seaming work using the type of seaming apparatus <br /> proposed for use on this project. <br /> B. Other Seamers Qualifications: All reamers must have seamed a minimum of <br /> 1,000,000 square feet of HDPE geomembrane. <br /> 4PForward Compost Facility Stormwater Improvements <br /> 02778 4 HDPE GEOMEMBRANE <br />
The URL can be used to link to this page
Your browser does not support the video tag.