Laserfiche WebLink
1.6 QUALITY ASSURANCE <br /> A. The OWNER will engage and pay for the services of a QA/QC CONSULTANT for <br /> monitoring the quality and installation of geomembrane material being installed <br /> unless otherwise specified. <br /> 1.7 DELIVERY, STORAGE,AND HANDLING <br /> A. General: Conform to the manufacturer's requirements. <br /> B. Delivery. <br /> 1. Deliver materials to the site only after the QA/QC CONSULTANT accepts <br /> required submittals. <br /> 2. Separate damaged rolls from undamaged rolls and store at locations <br /> designated by the OWNER until proper disposition of material is determined <br /> by OWNER. <br /> 3. QA/QC CONSULTANT will determine damage. <br /> 4. Deliver in rolls, do not fold. <br /> C. Storage on Site: <br /> 1. Store geomembrane rolls in the space allocated by the OWNER. <br /> 2. Store geomembrane rolls to protect from puncture, dirt, grease, water, <br /> moisture, mud, mechanical abrasions,excessive heat or other damage. <br /> 3. Store geomembrane rolls on prepared surface (not on wooden pallets). <br /> 4. Stack geomembrane rolls no more than three rolls high. <br /> D. Handling on Site: <br /> 1. Use appropriate handling equipment to load,move,and deploy geomembrane <br /> rolls. Appropriate handling equipment includes cloth chokers and spreader <br /> bars for loading,and spreader and roll bars for deployment. Dragging panels <br /> on ground surface will not be permitted. <br /> 2. Do not fold geomembrane material; folded material will be rejected. <br /> 3. The GEOSYNTHETICS CONTRACTOR is responsible for off-loading,storage,and <br /> transporting material from storage area to installation site. The EARTHWORK <br /> CONTRACTOR shall unload the materials if the GEOSYNTHETICS <br /> CONTRACTOR is not onsite. <br /> 4. The GEOSYNTHETICS CONTRACTOR shall be responsible for damage to HDPE <br /> geomembrane during delivery,even if the rolls are unloaded by the EARTHWORK <br /> CONTRACTOR. The QA/QC CONSULTANT will determine damage <br /> 1.8 WARRANTY (MANUFACTURER) <br /> A. Provide manufacturer's warranty for geomembrane material in compliance with <br /> provisions of the Conditions of the Contract. Provide a minimum 20-year pro rata <br /> warranty for the material against deterioration due to exposure to the elements,either <br /> exposed or buried. The warranty for material must cover costs of material <br /> replacement and installation; assuming the area is rendered in a clean, dry, <br /> unencumbered condition. In the event the area cannot be rendered as such, <br /> Forward Compost Facility Stormwater Improvements <br /> 02778 5 HDPE GEOMEMBRANE <br />