My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 General Requirements <br /> 2.1 Meetings <br /> In order to facilitate construction, and to clearly define construction goals and activities, close <br /> coordination between the Owner,Design Engineers,QA/QC Consultant,and Contractor is essential. <br /> To meet this objective,pre-construction and progress meetings will be held. <br /> 2.1.1 Pre-Construction Meeting <br /> Following bid award, a pre-construction meeting will be held at the site. The purpose of this <br /> meeting, attended by the Owner, Contractor, Design Engineer, QA/QC Consultant, and others <br /> designated by the Owner,will be to: <br /> Review the construction drawings, specifications,CQA Manual,work area security,health <br /> and safety procedures, and related issues. <br /> Provide all parties with relevant project documents. <br /> Amok Review responsibilities and qualifications of each party. <br /> Define lines of communication and authority. <br /> Establish reporting and documenting procedures. <br /> Review procedures for handling submittals. <br /> Review testing equipment and procedures. <br /> Review procedures for field directives and change orders. <br /> Establish testing protocols and procedures for correcting and documenting construction or <br /> non-conformance. <br /> • Establish weekly meeting schedule. <br /> • Conduct a site inspection to discuss work areas, stockpile areas,lay down areas,access <br /> roads, haul roads, and related items. <br /> • Review the project schedule and critical path items. <br /> • • Contractor's work plan. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.