Laserfiche WebLink
2.6 Materials Quality Verification <br /> 2.6.1 General <br /> Material sources will be identified and samples tested to determine if the material meets project <br /> specifications for specific work elements. Definitions and requirements of materials are provided in <br /> the Specifications. Test samples will be obtained in accordance with applicable ASTM standards. <br /> Archive samples and test results of the test samples will be maintained and stored at the project site. <br /> The QA/QC Inspectors will establish and maintain a materials quality verification list. The list will <br /> include material sources,sample locations,testing requirements,test results,and verification action <br /> items. <br /> 2.6.2 Materials Submittals <br /> Material submittals may be used by the QA/QC Consultant to establish the acceptability of materials. <br /> When sample submittals are required,they will be made available to the QA/QC Consultant by the <br /> Contractor. Acceptance and proper review of submittals are the responsibility of the QA/QC <br /> Manager. <br /> 2.6.3 Certificates of Compliance and Conformance <br /> Certificates of compliance and conformance may be used by the QA/QC Manager to establish the <br /> acceptability of materials. Those certificates generally state that the material is in compliance or <br /> conformance with a particular code, standard, or specification. The certificate may be used for <br /> acceptance of a product before or in lieu of testing, if allowed by the Specifications. <br /> 2.7 Equipment Control <br /> 2.7.1 Equipment List <br /> Before the start of construction,the QA/QC Manager will complete a list of all measuring,sampling, <br /> and testing equipment being used at the site. As new equipment becomes available during the course <br /> of the project, it must be added to the list. When more than one type of equipment is available, a <br /> unique number will be affixed to each piece to maintain identity. The equipment list shall be <br /> maintained in the project files and contain the following information: <br /> Type of equipment <br /> Serial number or identifying number <br /> Date item received at site <br /> Use of the equipment <br /> Date removed from service <br /> • <br /> Page 9 <br />