2.4.3 Documenting Non-Conformance is <br /> All non-conformance must be documented in writing on the daily records, logs, and elsewhere,as <br /> appropriate. The documentation must occur immediately upon determining the extent of the non- <br /> conformance. For those non-conformance which are considered serious or complex in nature, or <br /> which require an engineering evaluation,a Non-conformance Report will be prepared and issued to <br /> the Construction Manager and Contractor. <br /> 2.4.4 Corrective Measures <br /> For a simple or routine non-conformance, corrective measures will be determined by specification <br /> direction,or if none exists,the Construction Manager,QA/QC Manager and Contractor will discuss <br /> standard construction methods to correct the deficiency. For Non-conformance Reports which <br /> require an engineering evaluation,the Design Engineer must determine corrective measures. A copy <br /> of the Non-conformance Report,with the Design Engineer's corrective measure determination,will <br /> be forwarded to the Construction Manager,QA/QC Manager,and Contractor for implementation of <br /> the corrective action. <br /> 2.4.5 Verification of Corrective Measures <br /> Upon notification by the Contractor that a corrective measure is complete,the QA/QC Manager will <br /> verify its completion. The verification must be accomplished by observations or retesting and <br /> documented photographically. Written documentation of the corrective measures must be made by <br /> the QA/QC Manager on daily reports, logs, and forms, and, if applicable, the Non-conformance <br /> Report. Verification of corrective measure will be reviewed by the Construction Manager. <br /> Corrective action measures that require an engineering evaluation will be reviewed and verified by <br /> the Design Engineer. <br /> 2.5 Construction Monitoring <br /> 2.5.1 Monitoring Priorities <br /> Before commencement of construction, the QA/QC Manager will establish a list of monitoring <br /> priorities. The list includes the various construction activities and the monitoring priority of those <br /> activities. The monitoring priorities may change during construction, based upon Contractor <br /> performance and Owner request. Changes in the monitoring priorities must be approved by the <br /> QA/QC Manager. <br /> 2.5.2 Discrepancies <br /> All CQA testing must be conducted in accordance with this CQA Manual. If discrepancies exist <br /> between the Specifications and the CQA Manual,the document that requires the most frequent tests <br /> or has more stringent test requirements will govern, unless otherwise specified by the Design <br /> Engineer. <br /> Page 8 <br />