Laserfiche WebLink
southern portion of the site, south of the creek. <br /> C. Work of This Contract <br /> 1. Except as otherwise specifically stated in applicable parts of these Contract <br /> Documents, the CONTRACTOR shall provide and pay for labor, materials, <br /> equipment, tools, construction equipment, facilities, and services necessary <br /> for proper execution,testing, and completion of the Work. <br /> 2. The completed Work will provide OWNER with stormwater features, <br /> including ditches and a pond, which are constructed in accordance with the <br /> requirements of California Code of Regulations Title 27 and site specific <br /> permits. <br /> D. Major Work Elements Include: <br /> 1. Excavation <br /> 2. General Earthfill <br /> 3. Grading and Subgrade Preparation <br /> 4. GCL <br /> 5. HDPE Geomembrane <br /> 6. Geotextile <br /> 7. Granular Drainage Material <br /> 8. Coarse Gravel <br /> 9. Pipes and Culverts <br /> 1.4 OWNER FURNISHED PRODUCTS <br /> A. The OWNER shall retain and pay for the services of a surveyor for as-built <br /> surveys. <br /> B. The OWNER shall retain and pay for the services of the QA/QC CONSULTANT. <br /> C. The OWNER shall furnish the onsite soils for general earthfill. <br /> 1.5 MEETINGS AND COORDINATION <br /> A. Preconstruction meetings will be conducted between the OWNER, DESIGN <br /> ENGINEER and/or QA/QC CONSULTANT, EARTHWORK CONTRACTOR, <br /> and GEOSYNTHETICS CONTRACTOR. Specification requirements for that <br /> particular sequence of construction will be reviewed and discussed. The <br /> EARTHWORK and GEOSYNTHETICS CONTRACTOR shall present a <br /> construction plan for each construction sequence, as applicable, outlining the <br /> equipment, personnel, schedule and materials required. <br /> B. The EARTHWORK and GEOSYNTHETICS CONTRACTOR (when onsite) will <br /> be required to attend and participate in weekly construction meetings to review <br /> the schedule, specification requirements, quality control requirements, and other <br /> concerns involved. <br /> C. The EARTHWORK and GEOSYNTHETICS CONTRACTOR shall cooperate <br /> fully and coordinate activities with each other, refuse disposal workers, and <br /> OWNER's staff to ensure adequate notification and suitable access to the landfill <br /> Forward Compost Facility Stormwater Improvements <br /> 01100 2 SUMMARY <br />