My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
circumstances, in writing by the particular manufacturer. The CONTRACTOR <br /> will be held responsible for all installations not conforming to the manufacturers' <br /> recommendations. If any item of material or equipment is found to be installed <br /> not in accordance with the manufacturer's recommendations, the CONTRACTOR <br /> shall make all changes necessary to achieve such compliance. <br /> 1.10 WORK QUALITY <br /> A. Work shall be performed by mechanics and workers skilled and experienced in <br /> the fabrication and installation of the Work feature involved. All Work under this <br /> Contract shall be performed in accordance with the best practices of the various <br /> trades involved and in accordance with the Construction Drawings,reviewed shop <br /> drawings, and the Agreement Conditions. <br /> B. All Work shall be erected and installed plumb, level, square and true, or true to <br /> indicated angle, and in proper alignment and relationship to the Work of other <br /> trades. All finished Work shall be free from defects and damage. <br /> C. The QA/QC CONSULTANT reserves the right to reject any materials and Work <br /> quality that are not considered to be up to the general standards of the various <br /> trades involved. Such inferior material or Work quality shall be repaired or <br /> replaced, as directed, at no additional cost to the OWNER. <br /> 1.11 FIELD MEASUREMENT <br /> A. CONTRACTOR shall secure all field measurements required for proper and <br /> accurate fabrication and installation of the Work included in this Contract. Exact <br /> measurements are the CONTRACTOR's responsibility. The CONTRACTOR <br /> shall verify all dimensions in the field. <br /> 1.12 ACCESS TO WORK <br /> A. The authorized representatives of the following agencies will also have the right <br /> of access to inspect the Work covered by these Contract Documents during the <br /> performance of this Contract: <br /> 1. California Department of Resources Recycling and Recovery(CalRecycle). <br /> 2. San Joaquin County Department of Health Services. <br /> 3. San Joaquin County Air Pollution Control District. <br /> 4. Central Valley Regional Water Quality Control Board. <br /> 5. Other Local, State, and Federal Agencies. <br /> B. These inspections will be performed in the presence of the OWNER and QA/QC <br /> CONSULTANT. Reasonable facilities for the proper handling and inspection of <br /> the materials and the Work shall be furnished by the CONTRACTOR. <br /> 1.13 TESTING LABORATORY <br /> A. The QA/QC CONSULTANT will select and pay for the services of a testing <br /> laboratory(s) to conduct earthwork and other tests as required in the CQA Manual, <br /> except where the CONTRACTOR is specifically required to perform the testing. <br /> The costs of retests or additional testing caused by the CONTRACTOR's <br /> operations may be deducted from the payment due the CONTRACTOR. <br /> 1.14 PERMITS AND LICENSES <br /> Forward Compost Facility Stormwater Improvements <br /> 01100 4 SUMMARY <br />
The URL can be used to link to this page
Your browser does not support the video tag.