My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. The GDM shall be provided by the EARTHWORK CONTRACTOR. <br /> 2.4 COARSE GRAVEL <br /> A. Clean, washed, well-rounded,hard, durable gravel free from dirt, clay clods,roots, <br /> and other foreign materials. Material shall conform to the following washed sieve <br /> gradation as determined by ASTM C117 and C136: <br /> Sieve Size Percent Passing by Weight <br /> 111 <br /> 100 <br /> 1/2" 0-15 <br /> No. 4 0-5 <br /> No. 200 0-2 <br /> B. The minimum hydraulic conductivity to water shall be 1.0 cm/sec. <br /> C. Coarse Gravel Material placed directly on geotextile and around HDPE pipe shall <br /> contain no angular particles. <br /> D. Coarse Gravel Material shall contain no limestone or other material that will <br /> adversely react with leachate. <br /> E. The Coarse Gravel shall be provided by the EARTHWORK CONTRACTOR <br /> 2.5 SLURRY CEMENT MIXTURE AND CLSM <br /> A. The EARTHWORK CONTRACTOR shall submit to QA/QC CONSULTANT a <br /> proposed slurry cement mixture that will be suitable for use in the anchor trench. <br /> B. The EARTHWORK CONTRACTOR shall submit to QA/QC CONSULTANT a <br /> proposed CLSM mixture that will be suitable for use in the pipe trench. <br /> 2.6 POND SAFETY LADDER <br /> A. The pond safety ladder shall be constructed of a 3-inch diameter UV-protected <br /> nylon rope with rungs at a 2-ft minimum spacing. <br /> B. No 4 rebar shall be used to aid in anchoring the pond safety ladder in the anchor <br /> trench. <br /> Forward Compost Facility Stormwater Improvements <br /> 02300 5 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.