My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. The CONTRACTOR shall excavate to sufficient lines and grades to construct the <br /> ditches, trenches, pond, and sump as shown on the Construction Drawings and <br /> described in these Specifications. <br /> 1. Shape, trim, and cut ditches and other drainage structures as necessary to achieve <br /> grades and dimensions shown on the Construction Drawings. <br /> J. Excavate and remove loose and wet materials from the base of the existing <br /> sedimentation pond and scarify the surface prior to placing general earthfill. <br /> 3.5 LIMITS OF EXCAVATION <br /> A. Excavate to the depths and widths, as shown on the Construction Drawings. <br /> Allow for minimum thickness of clay liner as required. Excavation carried below <br /> the grade lines shown or established by the DESIGN ENGINEER shall be <br /> replaced with the same fill material as specified for the overlying fill or backfill, <br /> and compacted as required for such overlying fill or backfill. Where the overlying <br /> area is not to receive fill or backfill, replace the overexcavated material and <br /> compact to a density not less than that of the underlying ground. Cuts below <br /> grade shall be corrected by similarly cutting adjoining areas and creating a smooth <br /> transition. Correct all overexcavated areas at the EARTHWORK <br /> CONTRACTOR's sole expense. <br /> 3.6 STOCKPILE ACTIVITIES <br /> A. Stockpile all excavated material. Uniformly grade stockpile area to conform to <br /> existing contours, leave with a neat appearance, and maintain current drainage <br /> patterns. The stockpile shall have a slope no greater than two horizontal to one <br /> vertical and the top surface shall have a minimum 5 percent grade. <br /> 3.7 GRADING AND SUBGRADE PREPARATION <br /> A. This Work shall consist of fine grading and preparation of lining subgrade for the <br /> construction of the base and side slope lining. The lining subgrade is further <br /> defined as those areas and surfaces within the subgrade upon which lining <br /> materials are to be placed. <br /> 1. Fine grading shall be performed to grade the subgrade to within the tolerances <br /> specified in Section 01410, SURVEYS. <br /> 2. The prepared subgrade surface shall be smooth and free of major irregularities. <br /> The subgrade should contain no exposed particles larger than 3 inches or other <br /> surface irregularities which, in the opinion of the QA/QC CONSULTANT, <br /> will damage the overlying GCL, or 60-mil HDPE geomembrane. <br /> 3. Overexcavation below the established lining subgrade by the EARTHWORK <br /> CONTRACTOR shall, at his expense, be backfilled with General Earthfill <br /> Material as directed by the QA/QC CONSULTANT. <br /> 4. Once completed, all traffic shall be kept off the lining subgrade. <br /> Forward Compost Facility Stormwater Improvements <br /> 02300 9 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.