My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The lining subgrade shall be maintained in the finished condition until the first <br /> succeeding course is placed. Any damage to the prepared lining subgrade by <br /> the EARTHWORK CONTRACTOR shall be repaired, at the EARTHWORK <br /> CONTRACTOR's expense. Any damage to the prepared lining subgrade by <br /> the GEOSYNTHETICS CONTRACTOR, including those caused by a delay <br /> of the GEOSYNHETICS CONTRACTOR, shall be at the <br /> GEOSYNTHETICS CONTRACTOR's expense. <br /> 6. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 <br /> working days in advance of when the subgrade is completed and ready for as- <br /> built surveys. The OWNER will survey the top of the base and slope subgrade <br /> in accordance with Section 01410, SURVEYS. The survey shall provide <br /> coordinates and elevations of the subgrade surface at a minimum of 50-foot <br /> centers and delineating prominent features. The results of the survey will be <br /> provided to the QA/QC CONSULTANT within 2 days of the survey for <br /> approval prior to placing overlying materials. The QA/QC CONSULTANT <br /> shall have 2 working days to review survey results and may independently <br /> verify survey results. The time taken by the QA/QC CONSULTANT in <br /> checking and verifying the survey results will be considered included in the <br /> total calendar days allotted the EARTHWORK CONTRACTOR before <br /> liquidated damages are assessed. <br /> B. After completion of subgrade, proof-roll the surface of the base of the lined area <br /> with a loaded dump truck or similar heavy-wheeled equipment to detect soft or <br /> loose zones. Notify the QA/QC CONSULTANT prior to commencement of <br /> proof-rolling. If soft or loose zones are found, excavate the soft or loose material <br /> to a depth accepted by the QA/QC CONSULTANT, then fill with General <br /> Earthfill. The General Earthfill shall be compacted as specified for such fill. <br /> 3.8 COARSE GRAVEL MATERIAL <br /> A. General Requirements: Coarse Gravel shall be placed around riser pipe in sump <br /> area as shown on the Construction Drawings and should be fully encapsulated by <br /> geotextile. <br /> B. Coarse Gravel Placement: <br /> 1. The HDPE geomembrane lining underlying the Coarse Gravel shall be <br /> inspected and approved prior to placement of the Coarse Gravel. <br /> Forward Compost Facility Stormwater Improvements <br /> 02300 10 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.