My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Construct material limits within tolerance specified in Section 01410, SURVEYS. <br /> 3.21 TOPOGRAPHIC SURVEYS <br /> A. Refer to Section 01410, SURVEYS, for requirements regarding preconstruction <br /> surveys. <br /> B. The OWNER will conduct detailed topographic surveys of site to document "as- <br /> built" prepared subgrade on the base and slope of the retention basin, pan <br /> lysimeter, terminations of geomembrane liner, and the location of the interior crest <br /> of anchor trenches. The crests and bottom of the drainage ditches, culvert inverts, <br /> and pipe inlets and outlets shall also be documented. All surveys will be <br /> performed in accordance with Section 01410, SURVEYS. <br /> 1. Measure area elevations on minimum 50-foot-grid over entire impoundment <br /> area and at all breaks in grade. <br /> 2. Measure linear dimensions a minimum of 100-feet on center. <br /> 3. Plot results of topographic surveys to scale of 1 inch equals 50 feet and <br /> provide survey information in electronic format to QA/QC CONSULTANT. <br /> 4. QA/QC CONSULTANT will check the survey. The EARTHWORK <br /> CONTRACTOR shall not construct the lining system until survey approval <br /> is provided by the QA/QCCONSULTANT. QA/QC CONSULTANT's <br /> review shall be completed within 2 working days following receipt of the <br /> as-built survey information. <br /> 3.22 ACCEPTANCE OF WORK <br /> A. Final acceptance will be based on tests made on completed Work, on samples of <br /> material taken from the completed layers, and the as-built surveys. Testing for <br /> final acceptance will be performed by the QA/QC CONSULTANT in accordance <br /> with the requirements of these Specifications and the CQA Manual. <br /> 3.23 REMOVAL OF WATER <br /> A. Provide and operate equipment adequate to keep all excavations and trenches free <br /> of water. Remove all water as required for efficient and safe execution of the <br /> work, and as required by the QA/QC CONSULTANT. Avoid settlement or <br /> damage to adjacent property. Dispose of water in a manner that will not damage <br /> adjacent property. When dewatering open excavations, dewater from outside the <br /> structural limits and from a point below the bottom of the excavation when <br /> possible. Design dewatering system to prevent removal of fines from existing <br /> ground. <br /> PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT <br /> AND PAYMENT PROCEDURES) <br /> Forward Compost Facility Stormwater Improvements <br /> 02300 16 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.