Laserfiche WebLink
SECTION 02535 <br /> PIPES AND CULVERTS <br /> PART 1 GENERAL <br /> 1.1 WORK INCLUDED <br /> A. This section covers the work necessary to furnish and install, complete, the high <br /> density polyethylene (HDPE) pipe, fittings, and associated features specified <br /> herein. <br /> 1.2 REFERENCES <br /> A. The following documents are a part of this section. Where this Specification <br /> section differs from these documents,the requirements of this section shall apply. <br /> 1. ASTM D1248-84, Polyethylene Plastics Molding and Extrusion Materials. <br /> 2. ASTM D3350-84,Polyethylene Plastics Pipe and Fittings Materials. <br /> 3. ASTM F714-85, Polyethylene (PE) Plastic Pipe (SDR-PR) Based On <br /> Outside Diameter. <br /> 1.3 GENERAL <br /> A. All piping system components shall be the products of one manufacturer. <br /> 1.4 SUBMITTALS <br /> A. General: The EARTHWORK CONTRACTOR shall ensure that all submittals are <br /> complete and approved in accordance with the requirements and procedures in <br /> this Section. Submittals must include the reference numbers shown in this <br /> Section. <br /> B. Submittals required to be included with the Bid. <br /> 1. Qualifications (PIPE I A): A statement, in writing, from the pipe <br /> manufacturer that the installing contractor is qualified to install the pipe as <br /> described in this section. <br /> C. Submittals required to be submitted after contract award and prior to construction. <br /> 1. Material Data (PIPE2A): Catalog information confirming that the pipe <br /> material conforms to the requirements specified in this section. <br /> D. Submittals required to be submitted for project closeout. <br /> 1. Material Warranty (PIPE3A): Submit a Material Warranty signed by the <br /> Pipe Manufacturer. The Warranty shall certify that the material meets the <br /> specified properties listed in this Section. <br /> PART 2 PRODUCTS <br /> 2.1 PIPE <br /> A. The pipe shall be extruded from a polyethylene compound and shall conform to <br /> the following requirements: <br /> Forward Compost Facility Stormwater Improvements <br /> 02535 1 PIPES <br />