Laserfiche WebLink
B. Butt-Fusion Joining: Butt-fusion of pipes and fittings shall be performed in <br /> accordance with the pipe manufacturer's recommendations as to equipment and <br /> technique. Depending on site conditions, butt-fusion joining shall be performed <br /> in or outside of the excavation at the EARTHWORK CONTRACTOR's option. <br /> 3.6 PLACEMENT OF RISER PIPE <br /> A. Place riser pipe at location shown on the Construction Drawings. <br /> B. Connect pipe sections by thermal butt fusion. <br /> C. Construct riser support as described in Section 02300,EARTHWORK. <br /> 3.7 PLACEMENT OF POND INLET PIPE/CULVERTS <br /> A. Place pond inlet pipes/culverts at locations shown on the Construction Drawings. <br /> B. Connect pipe sections by thermal butt fusion. <br /> C. Backfill pipe trenches as shown on the Construction Drawings. <br /> D. Place and weld prefabricated HDPE boot at penetration of inlet pipe at the pond. <br /> E. Place one way valve at end of pipe at location shown on the Construction <br /> Drawings. <br /> 3.8 PROTECTION OF PIPE <br /> A. No construction traffic shall cross the pipe without sufficient cover as determined <br /> by the DESIGN ENGINEER. <br /> PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT <br /> AND PAYMENT PROCEDURES) <br /> END OF SECTION <br /> Forward Compost Facility Stormwater Improvements <br /> 02535 4 PIPES <br />