My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 EXECUTION <br /> 3.1 GENERAL <br /> A. All polyethylene pipe shall be cut, fabricated, and installed in strict conformance <br /> with pipe manufacturer's recommendations. Joining, laying, and pulling of <br /> polyethylene pipe shall be accomplished by personnel experienced in working <br /> with polyethylene pipe. <br /> B. Pipe shall be joined and placed in such a manner as to prevent damage to the <br /> HDPE Geomembrane Lining and other underlying geosynthetics. <br /> 3.2 TRANSPORTATION <br /> A. Care shall be taken during transportation of the pipe such that it is not cut, kinked, <br /> or otherwise damaged. <br /> 3.3 STORAGE <br /> A. Pipes shall be stored on level ground, preferably turf or sand, free of sharp objects <br /> that could damage the pipe. Stacking of the polyethylene pipe shall be limited to a <br /> height that will not cause excessive deformation of the bottom layers of pipes <br /> under anticipated temperature conditions. Where necessary due to ground <br /> conditions, the pipe shall be stored on wooden sleepers, spaced suitably and of <br /> such widths as not to allow deformation of the pipe at the point of contact with the <br /> sleeper or between supports. <br /> 3.4 HANDLING PIPE <br /> A. The handling of the joined pipeline shall be in such a manner that the pipe is not <br /> damaged by dragging it over sharp and cutting objects. Ropes, fabric, or <br /> rubber-protected slings and straps shall be used when handling pipes. Chains, <br /> cables, or hooks inserted into the pipe ends shall not be used. Two slings spread <br /> apart shall be used for lifting each length of pipe. Pipe or fittings shall not be <br /> dropped onto rocky or unprepared ground. Slings for handling the pipeline shall <br /> not be positioned at butt-fused joints. Sections of the pipes with cuts and gouges <br /> exceeding 10 percent of the pipe wall thickness or kinked sections shall be <br /> removed and the ends of the pipeline rejoined. <br /> 3.5 JOINING PIPE SECTIONS <br /> A. Pipes shall be joined to one another, to the polyethylene fittings, and to the flange <br /> connections by means of thermal butt-fusion. Polyethylene pipe lengths, fittings, <br /> and flanged connections to be joined by thermal butt-fusion shall be of the same <br /> type, grade, and class of polyethylene compound and supplied from the same raw <br /> material supplier. <br /> Forward Compost Facility Stormwater Improvements <br /> 02535 3 PIPES <br />
The URL can be used to link to this page
Your browser does not support the video tag.