My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. QA/QC CONSULTANT will reject rolls for whichquality control requirements are <br /> not met. <br /> C. Certify the quality of the rolls of geotextile. <br /> D. Provide quality control certificates for each lot and each shift's production. The <br /> quality control certificates must include: <br /> I. Roll numbers and identification. <br /> 2. Sampling procedures. <br /> 3. Results of quality control tests,including a description of test methods used. <br /> 2.4 LABELING <br /> A. Mark or tag geotextile rolls with the following information: <br /> I. Manufacturer's name. <br /> 2. Product identification. <br /> 3. Lot number or date. <br /> 4. Roll number. <br /> 5. Roll dimensions. <br /> B. Mark special handling requirements on rolls. <br /> 2.5 DAMAGED GEOTEXTILE <br /> A. Geotextile damaged during transportation,loading,unloading,and delivery shall be <br /> documented by the QA/QC CONSULTANT. <br /> B. The GEOSYNTHETICS CONTRACTOR shall repair geotextile damaged before <br /> delivery to the satisfaction of the QA/QC CONSULTANT. If the geotextile can not <br /> be repaired to the satisfaction of the QA/QC CONSULTANT, the damaged <br /> geotextile shall be replaced by the GEOSYNTHETICS CONTRACTOR,at no cost <br /> to the OWNER. <br /> PART 3 EXECUTION <br /> 3.1 EXAMINATION <br /> A. Prior to installation of geotextile,examine underlying construction for conformance <br /> with specifications. <br /> 3.2 PROTECTION <br /> A. When placing soil materials over geotextile ensure the following: <br /> I. No damage to geotextile. <br /> 2. No slippage of geotextile on underlying layers. <br /> 3. No excessive tensile stresses in the geotextile. <br /> B. Ensure that geotextiles are covered within 10 days of deployment. <br /> Forward Compost Facility Stormwater Improvements <br /> 02771 4 GEOTEXTILES <br />
The URL can be used to link to this page
Your browser does not support the video tag.