STANDARD PROVISIONS AND REPORTING REQUIREMENTS,JANUARY 2012 11 FOR WASTE DISCHARGE REQUIREMENTS <br /> FOR DISCHARGES REGULATED BY SUBTITLE D AND/OR TITLE 27 <br /> 23.All construction of liner systems and final cover systems shall be performed in <br /> accordance with a Construction Quality Assurance Plan certified by a registered <br /> civil engineer or a certified engineering geologist [Title 27, § 20323]. <br /> 24.The Construction Quality Assurance program shall be supervised by a <br /> registered civil engineer or a certified engineering geologist who shall be <br /> designated the CQA officer [Title 27, § 20324(b)(2)]. <br /> 25.The Discharger shall ensure that a third party independent of both the <br /> Discharger and the construction contractor performs all of the construction <br /> quality assurance monitoring and testing during the construction of a liner <br /> system. <br /> 26.The Discharger shall notify Central Valley Water Board staff at least 14 days <br /> prior to commencing field construction activities including construction of a new <br /> lined cell or module, construction of a final cover, or any other construction that <br /> requires Central Valley Water Board staff approval under this Order. <br /> 27.The Discharger shall submit for review and approval at least 60 days prior to <br /> proposed discharge, final documentation required in Title 27 Section <br /> 20324(d)(1)(C) following the completion of construction of a new lined landfill <br /> module. The report shall be certified by a registered civil engineer or a certified <br /> is engineering geologist and include a statement that the liner system was <br /> constructed in accordance with the approved design plans and specifications, <br /> the CQA Plan, the requirements of the WDRs, and that it meets the <br /> performance goals of Title 27. The report shall contain sufficient information <br /> and test results to verify that construction was in accordance with the design <br /> plans and specifications, the construction quality assurance plan, and the <br /> performance goals of Title 27. <br /> 28.The Discharger shall not discharge waste onto a newly constructed liner system <br /> until the final documentation report has been reviewed and an acceptance letter <br /> has been received. <br /> 29.Prior to placement of waste in a new landfill unit, the Discharger shall monitor <br /> any pan lysimeter for the unit that has received enough rainfall to flood the <br /> LCRS sump. If liquid is detected in the pan lysimeter, the Discharger shall verify <br /> that the liquid is not from a leak in the primary liner system before waste can be <br /> accepted to the new module. <br /> G. STANDARD CLOSURE AND POST-CLOSURE SPECIFICATIONS <br /> 1. The Discharger shall submit a final or partial final closure and post-closure <br /> maintenance plan at least two years prior to the anticipated date of closure <br /> [Title 27, § 21780(d)(1)]. <br />