Laserfiche WebLink
STANDARD PROVISIONS AND REPORTING REQUIREMENTS,JANUARY 2012 - 12- <br /> FOR <br /> 12_FOR WASTE DISCHARGE REQUIREMENTS <br /> FOR DISCHARGES REGULATED BY SUBTITLE D AND/OR TITLE 27 <br /> 2. The Discharger shall notify the Central Valley Water Board in writing that a <br /> landfill unit or portion of a unit is to be closed either at the same time that the <br /> California Department of Resources Recycling and Recovery (CalRecycle) is <br /> notified or 180 days prior to beginning any final closure activities, whichever is <br /> sooner [Title 27, § 21710(c)(5)(A)]. The notice shall include a statement that all <br /> closure activities will conform to the most recently approved final or partial final <br /> closure plan and that the plan provides for site closure in compliance with all <br /> applicable federal and state regulations [Title 27, § 21710(c)(5)(C)]. <br /> 3. Initiation of closure activities shall begin within 30 days of final waste receipt, or <br /> within one year of receipt of most recent waste if additional capacity remains <br /> [40 C.F.R. § 258.60(f)]. <br /> 4. Closure activities shall be completed within 180 days of the beginning of closure <br /> activities unless an extension is granted by the Executive Officer [40 C.F.R. § <br /> 258.60(g)]. <br /> 5. The Discharger shall carry out both mandatory closure and normal closure of a <br /> waste management unit or a portion of a unit in accordance with a closure and <br /> post-closure maintenance plan approved by the Central Valley Water Board <br /> [Title 27, § 20950(a)(1)] through the issuance of closure waste discharge <br /> requirements. <br /> 6. The Discharger shall notify the Central Valley Water Board that a preliminary <br /> closure and post-closure maintenance plan has been prepared and placed in <br /> the operating record by the date of initial receipt of waste at any new MSW <br /> landfill unit or lateral expansion of any existing unit [40 C.F.R. § 258.60(d)]. This <br /> notification shall be included in the cover letter transmitting the preliminary <br /> closure and post-closure maintenance plan. <br /> 7. In addition to the applicable provisions of Title 27, the preliminary closure and/or <br /> the post-closure maintenance plans for MSW landfill units shall include the <br /> following: <br /> a. A description of the steps necessary to close all MSW landfill units at any <br /> point during their active life in accordance with the cover design <br /> requirements [40 C.F.R. § 258.60(c)]; <br /> b. An estimate of the largest area of the landfill unit(s) ever requiring a final <br /> cover at any time during the active life of the unit(s) <br /> [40 C.F.R. § 258.60(c)(2)]; <br /> c. An estimate of the maximum inventory of wastes ever on-site over the <br /> active life of the waste management facility [40 C.F.R. § 258.60(c)(3)]; and <br /> d. A schedule for completing all activities necessary to satisfy the closure <br /> criteria in 40 C.F.R. section 258.60 [40 C.F.R. § 258.60(c)(4)]. <br />