My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:27:23 PM
Creation date
7/3/2020 11:20:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_1
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-1 <br /> 3.0 COMPOSTING FACILITY OPERATIONS <br /> ® Forward does not plan to locate or operate the Compost Facility on closed portions of the <br /> landfill. Forward operates a landfill on land north of the South Fork of South Littlejohn's <br /> Creek. <br /> 3.1 Introduction <br /> The Compost Facility uses the method of composting as discussed in Section 1.3.1. A <br /> detailed operating description is listed in Section 3.4 of this RCSI. The RRF and Compost <br /> Facility are permitted to operate between the hours of 6:00 a.m. to 6:00 p.m. Monday <br /> through Saturday. However, the RRF is open to receive materials from commercial <br /> customers Monday through Friday from 7:00 a.m. to 4:30 p.m. In addition, ancillary <br /> operations are also conducted on Saturday from 6:00 a.m. to 2:30 p.m. No equipment <br /> maintenance or operation is performed outside of the permitted hours of operation. <br /> Forward Inc. will provide 30 days prior notice to the LEA for any proposed change within the <br /> limitations of the current SWFP (i.e., not an extension of hours). A proposed change (i.e., <br /> extension) to these hours of operation would require a SWFP revision. The site is closed on <br /> Sundays, as well as on Christmas Day and New Year's Day. In addition, the business hours <br /> for the company office (in Stockton) are from 8:00 a.m. to 5:00 p.m. Monday through Friday. <br /> 3.2 Facility Personnel <br /> 3.2.1 Availability <br /> All employees are placed on a 6-month review period ("probation") at hire. The onsite <br /> personnel (including employees currently under review) consist of the following staff: <br /> ® 1 Operations manager <br /> 2 Equipment operators (duties also include general labor) <br /> 2 Laborers <br /> 1 Water truck driver <br /> - Temporary laborers, as needed <br /> Additional personnel will be added on an as-needed basis when, and if, a demand arises. <br /> Exact numbers of additional personnel are not known at this time. <br /> 3.2.2 Training <br /> Staff training generally consists of on-the job training under the supervision of someone <br /> experienced in the various aspects of the skills being taught. All personnel assigned to the <br /> operation shall be trained in subjects pertinent to operations and maintenance, physical <br /> contaminants and hazardous materials recognition and screening, with emphasis on odor <br /> impact management and emergency procedures in accordance with 14 CCR, Section <br /> 17867.5. Potential hazards and safety procedures are stressed. Currently, there are daily, <br /> weekly, and monthly meetings in addition to any "as needed" meetings. The daily meetings <br /> consist of health, safety, and current operational issues. The weekly meetings include <br /> health and safety discussions and videos, when available. The monthly meetings consist of <br /> 1 hour training(equipment, regulatory, etc.) sessions. <br /> Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information-November 2014 <br /> z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\resi 2014\text\9-nov 2014 track changes\sec 3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.