Laserfiche WebLink
3-1 <br /> 3.0 COMPOSTING FACILITY OPERATIONS <br /> ® Forward does not plan to locate or operate the Compost Facility on closed portions of the <br /> landfill. Forward operates a landfill on land north of the South Fork of South Littlejohn's <br /> Creek. <br /> 3.1 Introduction <br /> The Compost Facility uses the method of composting as discussed in Section 1.3.1. A <br /> detailed operating description is listed in Section 3.4 of this RCSI. The RRF and Compost <br /> Facility are permitted to operate between the hours of 6:00 a.m. to 6:00 p.m. Monday <br /> through Saturday. However, the RRF is open to receive materials from commercial <br /> customers Monday through Friday from 7:00 a.m. to 4:30 p.m. In addition, ancillary <br /> operations are also conducted on Saturday from 6:00 a.m. to 2:30 p.m. No equipment <br /> maintenance or operation is performed outside of the permitted hours of operation. <br /> Forward Inc. will provide 30 days prior notice to the LEA for any proposed change within the <br /> limitations of the current SWFP (i.e., not an extension of hours). A proposed change (i.e., <br /> extension) to these hours of operation would require a SWFP revision. The site is closed on <br /> Sundays, as well as on Christmas Day and New Year's Day. In addition, the business hours <br /> for the company office (in Stockton) are from 8:00 a.m. to 5:00 p.m. Monday through Friday. <br /> 3.2 Facility Personnel <br /> 3.2.1 Availability <br /> All employees are placed on a 6-month review period ("probation") at hire. The onsite <br /> personnel (including employees currently under review) consist of the following staff: <br /> ® 1 Operations manager <br /> 2 Equipment operators (duties also include general labor) <br /> 2 Laborers <br /> 1 Water truck driver <br /> - Temporary laborers, as needed <br /> Additional personnel will be added on an as-needed basis when, and if, a demand arises. <br /> Exact numbers of additional personnel are not known at this time. <br /> 3.2.2 Training <br /> Staff training generally consists of on-the job training under the supervision of someone <br /> experienced in the various aspects of the skills being taught. All personnel assigned to the <br /> operation shall be trained in subjects pertinent to operations and maintenance, physical <br /> contaminants and hazardous materials recognition and screening, with emphasis on odor <br /> impact management and emergency procedures in accordance with 14 CCR, Section <br /> 17867.5. Potential hazards and safety procedures are stressed. Currently, there are daily, <br /> weekly, and monthly meetings in addition to any "as needed" meetings. The daily meetings <br /> consist of health, safety, and current operational issues. The weekly meetings include <br /> health and safety discussions and videos, when available. The monthly meetings consist of <br /> 1 hour training(equipment, regulatory, etc.) sessions. <br /> Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information-November 2014 <br /> z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\resi 2014\text\9-nov 2014 track changes\sec 3.doc <br />