My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PR0440063_1990-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
4400 - Solid Waste Program
>
PR0440063
>
COMPLIANCE INFO_PR0440063_1990-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 3:46:00 PM
Creation date
7/3/2020 11:20:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PR0440063_1990-2019
RECORD_ID
PR0440063
PE
4467
FACILITY_ID
FA0002971
FACILITY_NAME
MUSCO FAMILY OLIVE CO
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
02
SITE_LOCATION
17950 W VIA NICOLO
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4467_PR0440063_17950 W VIA NICOLO_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> REQUIREMENTS FOR MONITORING WELL INSTALLATION WORKPLANS, <br /> AND <br /> MONITORING WELL INSTALLATION REPORTS <br /> SECTION 1 - Monitoring Well Installation Workplan <br /> A. General Information: <br /> 1. Purpose of well installation and sampling/analysis project <br /> 2. Site location map <br /> 3. Copies of County Well Construction Permits (to be submitted after workplan review) <br /> 4. New monitoring well locations and rationale <br /> 5. Equipment decontamination procedures <br /> 6. Health and safety plan <br /> 7. Topographic map showing any existing wells, proposed wells, waste handling <br /> facilities, utilities, and other major physical and man-made features. <br /> B. Drilling Details: <br /> 1. Drill rig and contractor <br /> 2. Sampling intervals and logging methods. <br /> C. Monitoring Well Design-Graphic and Descriptive: <br /> 1. Casing diameter and centralizer spacing (if needed) <br /> 2. Borehole diameter <br /> 3. Depth of surface seal <br /> 4. Well construction materials <br /> 5. Diagram of proposed well construction details <br /> 6. Type of well cap, bottom cap either screw on or secured with stainless steel screws <br /> 7. Size of perforations and rationale <br /> 8. Grain size of sand pack and rationale <br /> 9. Thickness and position of bentonite seal and sand pack <br /> 10. Depth of well, length and position of perforated interval. <br /> D. Well Development: <br /> 1. Method development <br /> 2. Method of determining when development is complete <br /> 3. Parameters to be monitored during development <br /> 4. Development water storage and disposal. <br /> E. Well Survey Coordinates, horizontal and vertical: <br /> 1. Name of the Licensed Land Surveyor or Registered Civil Engineer <br /> 2. Well features to be surveyed (i.e. top of casing, horizontal and vertical <br /> coordinates). <br /> 3. Horizontal (within 0.1 foot) and vertical accuracy (vertical must be at least 0.01-foot). <br /> F. Water Level Measurement: <br /> 1. The elevation reference point at each monitoring well must be within 0.01-foot <br /> 2. Ground surface elevation at each monitoring well must be within 0.01-foot <br />
The URL can be used to link to this page
Your browser does not support the video tag.