My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 8:42:54 AM
Creation date
7/6/2020 8:22:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Kimberly Matlock <br /> City of Tracy <br /> Department of Development Services -3- December 31, 2019 <br /> requirements. In addition, the Site Plan has been revised to relocate the new transformer to the <br /> previous location of the Healy Clean Air Separator. The Preliminary Landscape Plan has been <br /> revised to provide a tree next to the new transformer. The revised Plan is included with this <br /> resubmittal. <br /> 10. Please remove the Landscape Details Plan from the Plan Set. <br /> Response: The Preliminary Landscape Details Plan (Sheet L-2) has been removed from the <br /> enclosed Site Plan package. <br /> 11. Please remove the Floor Plan from the Plan Set. <br /> Response: The Concept Floor Plan and Lighting Plan (Sheet DD11-14A)has been removed from <br /> the enclosed Site Plan package. <br /> 12. Please provide the Arid Permeator Elevation and Controller Enclosure Elevation on the same <br /> Elevation Sheet as the Canopy Elevations. <br /> Response: The Canopy Elevation Sheet has been revised to include the ARID Permeator and <br /> Controller Enclosure Elevations. The revised Sheet is included with this resubmittal. <br /> 13. Please remove the Signage and Canopy Section Plan from the Plan Set. <br /> Response: The Signage and Canopy Section Plan (Sheet DD32-03) has been removed from the <br /> enclosed Site Plan package. <br /> 14. Please remove the first rendering(DD41-01) from the Plan Set. <br /> Response: The Concept Rendering (Sheet DD41-01) has been removed from the enclosed Site <br /> Plan package. <br /> Should you have any questions or require additional documentation please contact me at (425)251-6222 <br /> or by email atjanderson@barghausen.com. Thank you. <br /> Sincerely, <br /> 4-Julie Anderson <br /> Project Planner <br /> JA/CH/Ib [10050c.065.docx] <br /> enc: As Noted <br /> cc: Ms. Kim Katz, Costco Wholesale (email w/enc) <br /> Mr. John Ellingsen, Ellingsen & Company(Costco Google Drive w/enc) <br /> Mr. Joseph Welch, MG2 (email) <br /> Mr. Jared Bassetti, MG2 (email) <br /> Mr. Jay S. Grubb, Barghausen Consulting Engineers, Inc. <br /> Mr. Chris S. Ferko, Barghausen Consulting Engineers, Inc. <br /> Mr. Sean Anderson, Barghausen Consulting Engineers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.