My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 6:35:43 PM
Creation date
7/6/2020 1:03:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer 0✓ Industry Standard © Professional Engineer <br /> Test Type 0 Pressure Vacuum ❑I— Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 87 Gasoline 89 Gasoline 191 Gasoline <br /> Tank Manufacturer Xerxes Xerxes Xerxes <br /> Tank Capacity 10K 10K 8K <br /> Test Start Time 09:09 09:16 09:23 <br /> Initial Reading 10Hg 10Hg 10Hg <br /> Test End Time 10:09 10:16 10:23 <br /> Final Reading 10Hg 10Hg 10Hg <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +/- 0 +/- 0 +/- 0 <br /> Tightness Test Results M✓ Pass 0 Fail 0✓ Pass © Fail ® Pass © Fail © Pass 0 Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer Industry Standard © Professional Engineer <br /> Test Type © Pressure Q Vacuum © Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID 87 Product 89 Product 91 Product <br /> Pipe Manufacturer Smith Smith Smith <br /> Test Start Time 09:20 09:23 09:26 <br /> Initial Reading 5 psig 5 psig 5 psig <br /> Test End Time 10:20 10:23 10:26 <br /> Final Reading 5 psig 5 psig 5 psig <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +/- 0 +/- 0 +/- 0 <br /> Tightness Test Results Pass El Fail 0 Pass rj Fail Pass Ij Fail 0 Pass [n Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 0 Pass 0 Fail C Pass r] Fail I 0 Pass [C] Fail C Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.