My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012649
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0524706
>
ARCHIVED REPORTS_XR0012649
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:16:03 AM
Creation date
7/7/2020 9:02:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012649
RECORD_ID
PR0524706
PE
2960
FACILITY_ID
FA0016587
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
01
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Porti of Stockton <br /> 22010. Washington Street <br /> Stockton, California 95201 YY "'A1Attention: Mr. Richard W. Weitzenbsrg u� irE <br /> Gent' •� <br /> Maintenance and operation of port of Stockton trackage and <br /> railroad facilities are being Pexformed by the trunk carrir.ms on <br /> an alternatingannual basis. While the rota <br /> has provetion of operations . <br /> rs satisfactory, maintenance of the rail facilities does. <br /> not Send itself to rotation because-:of the- lack of continuity ; <br /> or the ability to' Perform programmed maintenance. . 'It is therS= <br /> fore deairab3 a that maintenanca b® under the supervis <br /> ione <br /> Bort oa s� continuous basis. s <br /> In accordance with tentative agreements reached representatives of the trunkline: carriexs and the Pockton, <br /> mairiteaanco of Port tsack .and other railroad facilitieassumed by the Port of Stockton and-performedtractor obtained by the Port. Followingare th eedun- ;:, <br /> cedu►res for maintenance of Port tracks: � Pon pro- <br /> 1. Part Engineer or other desigr1bd officer will supervise <br /> maintenances of Port trackage and railroad facilities. <br /> An appropriate budget will be prepared each year prier <br /> to May 1 covering maintenance expenditures on Port <br /> trackage for the following fiscal year commencing July <br /> I and ending on June 30. This budget will be reviewed <br /> P-3 approved by the engineering committee of the trunk <br /> line carriers. The budget to include listing of mainten- <br /> ance items by project and estimated cost. <br /> 2. The Port will contract for items on the approved budget <br /> during the fiscal year Without need for further authority <br /> from trunk line carriers. This Will include furnishing <br /> _. _initially-tine laborer or:'a- full-tiMe_basis.to handle the <br /> oiling of switches, weed controland miscellaneous day- <br /> to-day maintenance items. Items not on the approved <br /> . budget or items bid at a price exceeding budget estirate- <br /> ``` Kill. require specific authority from trunk lines engineor- <br /> ing cc=itte a before proceeding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.