My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:15:52 AM
Creation date
7/7/2020 9:09:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 March 2009 <br /> AGE-NC Project No. 01-0839 <br /> Page 4 of 6 <br /> to discuss regulatory compliance issues. <br /> • 27 January 2009: SJCEHD changes the scheduled 10 February 2009 meeting to 24 February <br /> 2009. <br /> • 13 February 2009: Mr. Giannecchini submits a petition to the Underground Storage Tank <br /> Cleanup Fund(USTCF) to change Priority Class from C to B. <br /> • 24 February 2009: A meeting is held at SJCEHD and attended by Mr. Giannecchini and <br /> AGE. <br /> • 26 February 2009: SJCEHD issues a letter requiring a schedule be submitted detailing the <br /> implementation of the interim SVE system. <br /> • 14 July 2009: SJCEHD issues a directive to reduce ground water monitoring from quarterly <br /> to semi-annually as required by the State Water Resources Control Board Resolution No. <br /> 2009-0042 dated 19 May 2009. <br /> • 27 August 2009: SJCEHD directs a monitoring event be conducted prior to 30 September <br /> 2009. <br /> • 29 September 2009: AGE performs the annual monitoring event. <br /> • 01 January 2010: The USTCF un-suspends Mr. Giannecchini's claim. <br /> • 05 January 2010: The USTCF changes Mr. Giannecchini's claim from Priority Class C to <br /> Priority Class B. <br /> • 13 January 2010: SJCEHD directs the interim SVE be implemented by 27 January 2010. <br /> • 03 February 2010: SJCEHD extends the implementation of the interim SVE system until 01 <br /> April 2010. <br /> As of the writing of this report, the implementation of the interim SVE appears to be delayed. The <br /> electrical connection from the PG&E source underground on the north side of Waterloo Road to the <br /> main power box located on the southwest corner of the main building at the site has to be <br /> re-evaluated. The electrical contractor who had completed a portion of the electrical wiring for the <br /> electrical upgrade and connection to the interim remediation system location in the northeast corner <br /> of the site appears to be out of business and cannot be reached.A new electrical contractor has been <br /> retained to evaluate the fmal electrical upgrades required and the additional electrical connections <br /> needed from PG&E.At this time,PG&E has not provided an evaluation of the connection needed. <br /> AGE will provide weekly updates to SJCEHD via email concerning the electrical connection issue. <br /> Advanced GeoEnvironmenlal,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.