My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:15:52 AM
Creation date
7/7/2020 9:09:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 March 2009 <br /> AGE-NC Project No. 01-0839 <br /> Page 3 of 6 <br /> completed by 20 October 2006. <br /> • 11 September 2006: AGE requests an extension to the deadline for implementation of the <br /> SJCEHD-approved Additional Site Assessment and SVE Pilot Test Work Plan Addendum <br /> dated 07 August 2006. <br /> • 19 September 2006: SJCEHD approves the requested extension to implement the SJCEHD- <br /> approved Additional Site Assessment and SVE Pilot Test Work Plan Addendum dated 07 <br /> August 2006 until 30 December 2006. <br /> • 12, 13 and 15 December 2006: AGE installed three shallow soil vapor extraction (SVE) <br /> wells (VW-1, VW-3 and VW-5) screened at 15 to 30 feet bsg and three deep SVE wells <br /> (VW-2,VW-4 and VW-6) screened at 45 to 60 feet bsg. <br /> • 26 December 2006: An 8-hour SVE pilot test was performed utilizing shallow SVE well <br /> VW-2 through SVE-6. <br /> • 27 December 2006:An abbreviated SVE pilot test was performed utilizing deep SVE wells <br /> VW-1,VW-3 and VW-5. <br /> • 26 January 2007: AGE submitted the results of the Soil Vapor Extraction Pilot Test in <br /> Additional Site Assessment and Soil Vapor Extraction Pilot Test Report. <br /> • 19 March 2007: SJCEHD reviews the AGE-prepared Additional Site Assessment and Soil <br /> Vapor Extraction Pilot Test Report dated 26 January 2007 and requires the preparation of <br /> an interim remediation action work plan by 11 May 2007. <br /> • 10 May 2007: AGE submits the Interim Soil Remediation Work Plan. <br /> • 24 May 2007: SJCEHD approves the AGE-prepared Interim Soil Remediation Work Plan <br /> dated 10 May 2007 to install an interim SVE system. <br /> • 03 July 2007: SJCEHD requires implementation of the AGE-prepared Interim Soil <br /> Remediation Work Plan dated 10 May 2007 by 20 August 2007. <br /> • 14 April 2008: AGE submits the Interim Remediation Work Plan Addendum proposing to <br /> modify the type of SVE system. <br /> • 12 August 2008: AGE requests via letter to modify the power source for the approved SVE <br /> system. <br /> • 19 August 2008: SJCEHD responds to the 12 August 2008 letter and requires the system to <br /> installed by 24 October 2008. <br /> • 07 October 2008: The Underground Storage Tank Cleanup Fund (USTCF) suspends Mr. <br /> Giannecchini's Priority Class C claim due to State of California budgetary crisis. <br /> • 22 January 2009: SJCEHD schedules a meeting with Mr.Giannecchini for 10 February 2009 <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.