Laserfiche WebLink
10 March 2009 <br /> AGE-NC Project No. 01-0839 <br /> Page 3 of 6 <br /> completed by 20 October 2006. <br /> • 11 September 2006: AGE requests an extension to the deadline for implementation of the <br /> SJCEHD-approved Additional Site Assessment and SVE Pilot Test Work Plan Addendum <br /> dated 07 August 2006. <br /> • 19 September 2006: SJCEHD approves the requested extension to implement the SJCEHD- <br /> approved Additional Site Assessment and SVE Pilot Test Work Plan Addendum dated 07 <br /> August 2006 until 30 December 2006. <br /> • 12, 13 and 15 December 2006: AGE installed three shallow soil vapor extraction (SVE) <br /> wells (VW-1, VW-3 and VW-5) screened at 15 to 30 feet bsg and three deep SVE wells <br /> (VW-2,VW-4 and VW-6) screened at 45 to 60 feet bsg. <br /> • 26 December 2006: An 8-hour SVE pilot test was performed utilizing shallow SVE well <br /> VW-2 through SVE-6. <br /> • 27 December 2006:An abbreviated SVE pilot test was performed utilizing deep SVE wells <br /> VW-1,VW-3 and VW-5. <br /> • 26 January 2007: AGE submitted the results of the Soil Vapor Extraction Pilot Test in <br /> Additional Site Assessment and Soil Vapor Extraction Pilot Test Report. <br /> • 19 March 2007: SJCEHD reviews the AGE-prepared Additional Site Assessment and Soil <br /> Vapor Extraction Pilot Test Report dated 26 January 2007 and requires the preparation of <br /> an interim remediation action work plan by 11 May 2007. <br /> • 10 May 2007: AGE submits the Interim Soil Remediation Work Plan. <br /> • 24 May 2007: SJCEHD approves the AGE-prepared Interim Soil Remediation Work Plan <br /> dated 10 May 2007 to install an interim SVE system. <br /> • 03 July 2007: SJCEHD requires implementation of the AGE-prepared Interim Soil <br /> Remediation Work Plan dated 10 May 2007 by 20 August 2007. <br /> • 14 April 2008: AGE submits the Interim Remediation Work Plan Addendum proposing to <br /> modify the type of SVE system. <br /> • 12 August 2008: AGE requests via letter to modify the power source for the approved SVE <br /> system. <br /> • 19 August 2008: SJCEHD responds to the 12 August 2008 letter and requires the system to <br /> installed by 24 October 2008. <br /> • 07 October 2008: The Underground Storage Tank Cleanup Fund (USTCF) suspends Mr. <br /> Giannecchini's Priority Class C claim due to State of California budgetary crisis. <br /> • 22 January 2009: SJCEHD schedules a meeting with Mr.Giannecchini for 10 February 2009 <br /> Advanced GeoEnvironmental,Inc. <br />