My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:15:52 AM
Creation date
7/7/2020 9:09:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 26 January 2007 <br /> AGE-NC Project No. 01-0839 <br /> Page 6 of 12 <br /> 4.3. WELL COMPLETION <br /> ' Pilot boring MW5 was completed as ground water monitoring well MW-5 using 2-inch diameter, <br /> ' Schedule 40 PVC casing with 0.020-inch slotted screen installed from 60 feet to 80 feet bsg. The <br /> filter pack (No. 3 Lonestar sand) was installed from 58 feet to 60 feet bsg and a nominal 2-foot <br /> bentonite chip plug was installed above the filter pack and hydrated. The remaining annular space <br /> ' was filled to near the surface with a portland cement grout mix and a water-tight,traffic-rated well <br /> box was installed over the well. An as-built well diagram is depicted on the boring log in <br /> Appendix D. <br /> 5.0. CPT AND WELL INSTALLATION FINDINGS <br /> ' Soil stratigraphy was determined from field data collected during advancement of the CPT soil <br /> borings and the monitoring and vapor well pilot soil borings; hydrocarbon impact to ground water <br /> 1 and soil was quantified by laboratory analysis of ground water and soil samples. <br /> 5.1. STRATIGRAPHY <br /> The site stratigraphy appears to be dominated by fine-grained material(silty clay,clayey silt,and silt) <br /> from surface grade to the total depth of boring CPT-2(150 feet bsg). Silty sand, sandy silt,and sand <br /> were encountered in borings V W l,V W 6,and V W 3 beginning at 15 feet bsg and extending to 25 feet <br /> or 30 feet bsg; the sand was generally fine- to very fine-grained and poorly graded except for the <br /> clean sand encountered at 30 feet bsg in boring VWl, which was fine- to coarse-grained, well <br /> graded,and contained some gravel.Zones of sandy silt were identified in boring VW 1 at 50 feet and <br /> ' 60 feet bsg, in boring VW6 at 60 feet bsg, and in boring VW3 at 55 feet bsg. In boring MW5, <br /> approximately 250 feet east of the site,sandy silt and silty sand were identified at 45 feet and 50 feet <br /> bsg,respectively. From 55 feet bsg to 80 feet bsg,the total depth of the boring, light brown to dark <br /> ' brown, clean sand was encountered. The sand was fine- to coarse-grained with some gravel and <br /> generally saturated and well graded. This sand layer is identified on the CPT boring logs beginning <br /> at approximately 65 feet and extending to approximately 73 feet in boring CPT-I and 79 feet in <br /> ' boring CPT-2.An additional sandy layer is apparent in the CPT-2 boring log between approximately <br /> 91 feet and 97 feet bsg. <br /> ' The CPT computer-generated boring logs are included in Appendix C; monitoring and vapor well <br /> pilot soil boring logs are included in Appendix D. <br /> 1 <br /> Advanced GcoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.