My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:15:19 AM
Creation date
7/7/2020 9:11:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interim Soil Remediation Work Plan <br /> ERNIE'S GENERAL STORE <br /> 4407 East Waterloo Road, Stockton, California <br /> 1.0. INTRODUCTION <br /> On behalf of Mr.Ernest P.Giannecchini of Ernie's General Store,Advanced GeoEnvironmental has <br /> prepared this Interim Soil Remediation Work Plan for the property located at 4407 East Waterloo <br /> Road, Stockton, California(site). The scope of work includes installation of an interim soil vapor <br /> extraction remediation system at the site. The location of the site and the surrounding area are <br /> illustrated on Figure 1; a plan of the site is illustrated on Figure 2. <br /> Based on the results of vapor extraction pilot tests performed at the site on 26 and 27 December <br /> 2006, AGE had recommended that an interim remediation work plan be prepared for soil vapor <br /> extraction (SVE) utilizing shallow-screened vapor wells VW-2, VW-4, and VW-5. On 19 March <br /> 2007, the San Joaquin County Environmental Health Department (EHD) approved AGE's <br /> recommendation for interim soil vapor extraction and directed that an interim remediation work plan <br /> be submitted to the EHD by 11 May 2007. <br /> The purpose of this work plan is to detail the design, installation, and operation of a catalytic <br /> oxidizer soil vapor extraction system. This work plan has been prepared in accordance with <br /> guidelines issued by the Central Valley Regional Water Quality Control Board (CVRWQCB) for <br /> investigation of underground storage tank(UST) sites. A summary of previous investigation at the <br /> site is included in Appendix A. <br /> 2.0. SCOPE OF WORK <br /> Based on the results of the above-referenced SVE pilot tests performed at the site in December 2006, <br /> AGE proposes to install,operate,and maintain an interim SVE remediation system utilizing existing <br /> shallow SVE wells VW-2, VW-4, and VW-5. <br /> Interim remediation field activities will consist of the following tasks: <br /> • Pre-field work activities; <br /> • Installation of a soil vapor extraction system; <br /> • Soil vapor extraction system start-up period; <br /> • Monitoring and maintenance activities; <br /> • Progress/confirmation sampling; and <br /> • Report preparation. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.