10 May 2007 <br /> AGE-NC Project No. 01-0839 <br /> Page 2 of 5 <br /> Each of these tasks is described in greater detail below. <br /> 2.1. PRE-FIELD WORK ACTIVITIES <br /> Applicable site permits will be obtained from the City of Stockton (i.e., electrical, building, <br /> plumbing, etc.)and from the San Joaquin Valley Unified Air Pollution Control District(APCD). In <br /> addition,an update to the health and safety plan presently on-file will be prepared in accordance with <br /> Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (National <br /> Institute for Occupational Safety and Health Administration, U.S. Coast Guard and U.S. <br /> Environmental Protection Agency, 1985).Prior to mobilization,all underground trenching areas will <br /> be clearly marked and a utility clearance obtained through Underground Service Alert. <br /> 2.2. REMEDIATION WELLS <br /> Currently, SVE wells VW-2, VW-4, and VW-5 are screened through the shallow vadose zone <br /> (15 feet to 30 feet below surface grade [bsg]) and are located in the suspected core area of the <br /> petroleum-impacted soil at the site.Based on the results of the SVE pilot tests conducted at the site <br /> in December 2006,a theoretical radius of influence of approximately 62 feet was estimated for SVE <br /> utilizing the shallow wells.Utilization of wells VW-2,VW-4,and VW-5 for an interim remediation <br /> SVE system should be adequate to extract soil vapor from the core area of petroleum-impacted soil <br /> beneath the UST area. <br /> 2.3. INSTALLATION OF INTERIM REMEDIATION SYSTEM PIPING NETWORK <br /> The remediation system piping network will be installed underground in a I-foot wide by 1%-foot <br /> deep trench.The proposed underground trenching location is depicted on Figure 2;a cross sectional <br /> view of the trench is depicted on Figure 3. In the trench, 2-inch diameter, schedule 40 PVC piping <br /> will be manifolded from the well-heads at VW-2,VW-4,and VW-5 and routed to the proposed soil <br /> vapor extraction unit(catalytic oxidizer). Following piping placement,the trench will be backfilled <br /> with imported road-base sand, compacted, and resurfaced to grade with asphalt. <br /> 2.4. PROPOSED INTERIM SOIL REMEDIATION SYSTEM <br /> The proposed SVE treatment unit will be a Solleco Ecat 250, which consists of a condensation <br /> separator, a vacuum blower, an electrically heated catalytic oxidizer, and control components. The <br /> 2-inch diameter piping installed from the well-head at wells VW-2, VW-4, and VW-5 will be <br /> Advanced GeoEnvironmental,Inc. <br />