My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:15:19 AM
Creation date
7/7/2020 9:11:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 May 2007 <br /> AGE-NC Project No. 01-0839 <br /> Page 4 of 5 <br /> 2.6. MONITORING AND MAINTENANCE <br /> Following the initial start-up period, influent and effluent air-flow vapor samples will be collected <br /> on a monthly basis and submitted to a DHS-certified laboratory for analysis for TPH-g,BTEX,and <br /> MTBE. Laboratory reports for vapor sample analyses, testing methods, laboratory quality <br /> assurance/quality control (QA/QC) reports, and sample chain of custody documentation will be <br /> presented in quarterly reports. <br /> The SVE interim remediation system will be maintained on a weekly basis according to <br /> manufacturer's recommendations (i.e., lubrication, oil changing, system adjustments, etc.). <br /> 2.7. REPORT PREPARATION <br /> Quarterly reports will be prepared presenting the findings from the SVE interim activities. The <br /> quarterly reports will include a description of work performed and the results of the influent and <br /> effluent vapor samples. Conclusions and recommendations will also be included in the reports, if <br /> applicable.The report will be in a format acceptable to CVRWQCB guidelines and will be reviewed <br /> and signed by a California Professional Geologist. <br /> 3.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> Professional Geologist. Procedures for underground piping installation, start-up period, and <br /> weekly/monthly operation and maintenance procedures are described below. <br /> 3.1. REMEDIATION SYSTEM PIPING NETWORK <br /> A network of 2-inch diameter, schedule 40 PVC piping will be installed from remediation wells <br /> VW-2, VW-4, and VW-5 in a series of trenches, approximately 12 inch wide and 18 inches deep. <br /> All PVC piping will be routed from each remediation well head to the SVE condensation entrapment <br /> tank, located inside the SVE remediation system fenced enclosure. A PVC ball valve will be <br /> installed at each SVE well head so that soil-gas vapor can be drawn from each well independently <br /> or from a combination of specific wells. Following piping placement,the trench will be backfilled <br /> with imported road-base sand,compacted,and resurfaced with asphalt.Cross sectional views of the <br /> process piping layout are illustrated on Figure 3. <br /> Advanced GeuEnviromnental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.