My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:15:19 AM
Creation date
7/7/2020 9:11:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 May 2007 <br /> AGE-NC Project No. 01-0839 <br /> Page 3 of 5 <br /> connected to the inlet of the condensation separator,which leads into the vacuum blower;the outlet <br /> from the vacuum blower will be routed through a heat exchanger and then a catalytic converter cell. <br /> Induced vacuum will be measured utilizing a Magnehelic vacuum gauge attached to the inlet of the <br /> blower; SVE air flow will be monitored using a Dwyer DS-200 flow sensor. Sampling ports will be <br /> installed upstream of the vacuum blower inlet to recover SVE influent air flow vapor stream <br /> samples, and downstream of the catalytic converter cell chamber to recover effluent SVE air flow <br /> samples and to monitor the efficiency of hydrocarbon destruction.A schematic diagram of the SVE <br /> treatment unit is depicted on Figure 4; additional information is included in Appendix B. <br /> The proposed location of the SVE unit will be in the north section of the site(Figure 2),which will <br /> allow the Ernie's General Store facility to conduct day to day business without interference from the <br /> operation of the SVE remediation system. The SVE unit will be secured by a chain-linked, gated <br /> enclosure approximately 15 feet wide, 20 feet long, and 7 feet high. Electricity is readily available <br /> to the site; a dedicated electrical meter will be installed by representatives of the City of Stockton <br /> Utilities that will connect directly to the SVE unit. <br /> 2.5. INTERIM REMEDIATION START-UP PERIOD <br /> During the SVE start-up period (first week of operation), in order to monitor hydrocarbon <br /> destruction efficiency,influent and effluent air-flow vapor samples will be collected on a daily basis <br /> and submitted to a State of California Department of Health Services(DHS)-certified laboratory for <br /> analysis for the following constituents: <br /> • Total petroleum hydrocarbons quantified as gasoline (TPH-g) in accordance with EPA <br /> Method 8015 Modified; and <br /> • Benzene, toluene, ethylbenzene, and total xylenes (BTEX) and methyl tertiary-butyl ether <br /> (MTBE) in accordance with EPA Method 8260B. <br /> SVE operational parameters including soil-gas vapor concentrations, air flow, vacuum, and <br /> temperature will be monitored on a daily basis to gauge the optimal destruction rate of recovered <br /> hydrocarbon vapors. <br /> Following the SVE start-up period,air-flow vapor samples will be collected on a monthly basis and <br /> the SVE operational parameters will be monitored on a weekly basis to monitor cleanup progress. <br /> Advanced GeoEnvironmeotel,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.