Laserfiche WebLink
81a63 Eavi)onmvital N1aitagenient !tic U-Haul#709 50 <br /> 002-70950-04 Groundwater Monitoring Report <br /> 03/27!02 <br /> 5 0 RECONIIINIENDATIONS <br /> Blaes Environmental plans to implement the work plan for well installation, remedial testing and turther <br /> assessment of hydrocarbon in groundwater during the second quarter of 2002 The planned second <br /> quarter 2002 groundwater monitoring and sampling event will likely include at least two additional <br /> monitoring wells one located west of the site on Stockton Unified School District property and one <br /> located near the propane dispenser on the southeast portion of the U-Haul site The second quarter <br /> groundwater monitoring and sampling event is scheduled for June 2002 <br /> 10 <br />