My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007151
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2701
>
3500 - Local Oversight Program
>
PR0540315
>
ARCHIVED REPORTS_XR0007151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 3:01:55 PM
Creation date
7/7/2020 2:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007151
RECORD_ID
PR0540315
PE
3526
FACILITY_ID
FA0023046
FACILITY_NAME
U-HAUL FACILITY NO 710050
STREET_NUMBER
2701
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95215
APN
11708014
CURRENT_STATUS
01
SITE_LOCATION
2701 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blaes Environmental Manageraenl Inc U-Haul#709-50 <br /> 002-70950-03 Work Plan <br /> 11/8/01 <br /> level changes and rebound rates following the conclusion of pumping Data compiled in the data logger <br /> will be downloaded to a lap-top computer in the field Data will be compiled and summarized in the <br /> remedial feasibility report <br /> During the tests, groundwater samples will be collected from the extracted water from the pump for <br /> analysis Two samples will be collected at each extraction well, four samples in total One sample will be <br /> collected midway through the test and the other sample will be collected at the termination of the test <br /> The groundwater samples will be analyzed for TPHg and BTEX using EPA Method 8015/8021 <br /> Groundwater generated during testing will be stored in four 1,000-gallon polyethylene tanks It is <br /> anticipated that testing will generate up to 3,300 gallons of groundwater The extracted groundwater will <br /> be promptly removed to the site and recycled at an appropriate facility <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.