Blaes Environmental Manageurenl fnc U-Haul#709-50 <br /> 002-70950-03 Work Plan <br /> 1118101 <br /> 60 PROPOSED SCHEDULE <br /> Blaes Environmental will implement the proposed activities presented in this work plan according to the <br /> following tentative schedule Based upon this schedule, BIaes Environmental anticipates completion of <br /> the scope of work and submittal of the CAP to the SJC within 25 weeks after approval of this work plan <br /> Following the final CAP approval from the SJC, Blaes Environmental anticipates an additional 16 weeks <br /> to complete the remedial design and permitting services <br /> Tentative Schedule of Work by Activity <br /> ACTIVITY START ACTIVITY TIME TO COMMENTS <br /> (from receipt of SJC COMPLETE (Potential Time <br /> approval) EACH ACTIVITY Delays) - <br /> j Monitor Well Installation Week 2 12 Weeks Off-site Access <br /> Coordination Issues <br /> Monitor Well Installation Week 14 1 Week Driller Availability <br /> Remedial Well Installation Week 15 1 Week Driller Availability <br /> Remedial Pilot Tests Week 16 1 Week Vapor-phase <br /> granular activated <br /> carbon disposal <br /> CAP Preparation Week 17 8 Weeks Analytical, Geo- <br /> technical and Level I <br /> Bio-assay data <br /> CAP Submittal Submit on Week 25 <br /> ACTIVITIES FOLLOWING FINAL CAP APPROVAL BY THE SJC <br /> Remedial Design Services Week 2 8 Weeks Electrical and <br /> Mechanical Design <br /> Remedial Permitting Week 2 16 Weeks City conditional use <br /> permit and other <br /> utility permits <br /> 22 <br />