1• 11 March 2002 <br /> AGE-NC Project No. 95-0130 <br /> 1 Page 12 of 13 <br /> ' report with findings and recommendations. <br /> Purged ground water will be containerized in an on-site 10,000-gallon Baker tank; following <br /> 1 the 24-hour pump test, a composite "grab" ground water sample will be collected from the <br /> Baker tank to analyze for TPH-g, BTEX, MTBE, TBA, TAME, DIPE, ETBE, EDB and 1,2- <br /> DCA by EPA Methods 8015M,8020 and 8260M.The purged ground water will be transported <br /> ' under non-hazardous waste manifest off-site to an appropriate disposal facility. <br /> ' 4.5. SOIL VAPOR EXTRACTION PILOT TEST <br /> Following SVE well installation, an eight-hour SVE pilot test will be performed at the site to <br /> 1 determine feasibility of SVE as a remediation alternative.An internal combustion(IC) driven <br /> engine will be used to apply a vacuum on SVE well VW-4 while wells VW-1, VW-2, VW-3, <br /> EW-1 and MW-8 will be utilized as observation points. During the SVE pilot test, SVE <br /> operational parameters including soil-gas vapor concentrations,air flow and vacuum measurements <br /> will be monitored at 1/2-hour intervals utilizing Dwyer Magnehelic vacuum gauges and a photo- <br /> ionization detector(PID: Thermo Environmental 580A; 10.0 eV; calibrated to isobutylene). <br /> • Soil vapor samples will be collected at two-hour intervals utilizing a hand air-vacuum pump <br /> and Tedlar bags and analyzed for TPH-g,BTEX and MTBE from a DHS-certified laboratory. <br /> 1 Soil vapor field parameters and analytical results will facilitate the design of an SVE system <br /> and will be used to determine a general radius of influence for spacing of SVE wells and the <br /> selection of an appropriate SVE system. <br /> ' 4.6. IN-SITU AIR SPARGING PILOT TEST <br /> Following the SVE pilot test,an IAS pilot test will be performed. For performance of an in-situ air <br /> ' sparging(IAS)pilot test, a compressor driven unit will be used to inject air into the subsurface via <br /> the IAS well. The IAS pilot test will be operated for a period of 48-hours(2 days). IAS well AW-1 <br /> will be utilized as the air injection point during the 48-hour IAS pilot test while wells MW-1, <br /> ' MW-2,MW-3,MW-5,MW-8,VW-1,VW-2,VW-3 and EW-1 will be utilized as observation <br /> points. Several parameters, including air injection rate, vapor concentrations, ground water depth <br /> and dissolved oxygen will be measured at a minimum of 1-hour intervals from observation wells. <br /> Results of the IAS pilot test will be included in a CAP. <br /> 1 • <br /> Advanced GeoEnvironmen[aI,Inc. <br />