Laserfiche WebLink
i <br /> 5 <br /> 15 November 2005 <br /> AGE-NC Project No 95-0130 <br /> Page 10 of 10 <br /> washed with a solution of Alconox All down-hole drilling and sampling equipment will be pressure <br /> washed prior to starting each boring <br /> 4 4 BORING DESTRUCTION <br /> All soil borings will be permanently sealed to prevent vertical migration of potential contaminants <br /> At the completion of CPT and ground water sampling activities, all CPT borings and sample soil <br /> borings will be backfilled by inserting hollow steel rods to total depth of each boring and backfilling <br /> with a portland cement grout mix, the EHD will be notified at least 48 hours in advance of field <br /> work and given the opportunity to inspect the grout mix prior to backfilling activities <br /> • <br /> • <br /> Advanced GeoEnvironmental,Inc. <br />