Laserfiche WebLink
27 September 1999 <br /> AGE-NC Project No 95-0130 <br /> Page 5 of 5 <br /> • Continued quarterly ground water momtonng The next quarterly monitoring and sampling <br /> is scheduled for September 1999 <br /> • Continued utilization of wells VW-1, V W-2 and VW-3 for characterization of ground water <br /> conditions in the "core area" <br /> • Proceed with drilling activities upon UST Cleanup pre-approval as outlined in the Work Plan <br /> Addendum -June 1998, dated 23 June 1998 and approved by the PHS-EHD by letter dated <br /> 18 August 1999 <br /> 6 0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory and a well casing elevation survey <br /> performed by an independent sub contractor Evaluations of the geologic/hydrogeologic conditions <br /> at the site for the purpose of this investigation were made from a limited number of available data <br /> points (i a monitoring well ground water samples), and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> Adianced GeoEwiron mental,Inc <br />