Laserfiche WebLink
08 March 1999 <br /> AGE-NC Project No 95-0I30 <br /> Page 5 of 5 <br />' • Installation of the remediation system upon regulatory approval of the Remedial Action Work <br /> Plan, dated 03 July I997, submitted to the PHS-EHD for an in-situ soil vapor extraction/air <br />' sparging system within the petroleum hydrocarbon "core area" <br /> • Continued utilization of wells VW-1, VW-2 and VW-3 for characterization of ground water <br />' conditions in the "core area" <br /> • Proceed with drilling activities outlined in the Work Plan Addendum -June 1998, dated 23 <br /> June 1998, upon regulatory approval <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory and a well casing elevation survey <br /> performed by an independent sub contractor Evaluations of the geologic/hydrogeologic conditions <br /> at the site for the purpose of this investigation were made from a limited number of available data <br /> points (i a monitoring well ground water samples), and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br />' recommendations contained in this report <br /> Advanced GeoEmironmentai,Inc <br /> 1 <br />