Laserfiche WebLink
I <br /> I21 May 2003 <br /> . AGE-NC Project No 95-0130 <br /> IPage 16 of 16 <br /> I the start-up period to ensure optimal removal of dissolved hydrocarbons and dissolved MTBE, <br /> thereafter, operation and maintenance procedures will be performed on a weekly basis and ground <br /> water samples will be collected on a monthly basis <br /> I <br /> 4 5 4 Pump-and-Treat Monitoring and Maintenance Activities <br /> iGround water samples from the pump and treat system Influent and effluent stages will be collected <br /> on a monthly basis and submitted to a DHS-certified laboratory for analysis of contaminants listed <br /> i In Section 3 7 Ground water treatment operational parameters will be recorded weekly to monitor <br /> cleanup progress, and the ground water treatment system will be maintained on a weekly basis <br /> according to manufacturers recommendations <br /> 4 6 REPORT PREPARATION <br /> iQuarterly reports will be prepared presenting the findings from SVE activities The quarterly reports <br /> • will Include a description of work performed and the results of the Influent and effluent soil-gas <br /> ianalysis Conclusions and recommendations will also be included In the reports, If applicable The <br /> report will be In a format acceptable to RWQCB guidelines, and will be reviewed and signed by a <br /> ICalifornia Registered Geologist <br /> i <br /> I <br /> i <br /> I <br /> I <br /> I <br /> • <br /> iAdvanced GcoEnvironmentai,Inc <br /> I <br />