My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2020 2:34:55 PM
Creation date
7/10/2020 2:17:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0508452
PE
2361
FACILITY_ID
FA0007787
FACILITY_NAME
PACIFIC CAR WASH/MARKETPLACE INC
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> Site Safety Plan <br /> The provisions set forth in this SSP will apply to all employees of Walton Engineering , Inc . <br /> ( Walton) and all other contractors/subcontractors working on this project . The <br /> contractors/subcontractors may elect to modify these provisions , but only to upgrade or <br /> increase the safety requirements , and only with the concurrence of Walton , as designated <br /> and accepted in writing . <br /> This SSP addresses the expected potential hazards that may be encountered for this <br /> project . Field activities are planned to begin on August 24 , 2017 , with the duration <br /> estimated at approximately two (2 ) days . If changes in site or working conditions occur as <br /> the activities progress , addenda to this SSP will be provided by Walton . <br /> AUTHORITY FOR SITE SAFETY <br /> Walton employee responsible for the project safety is the Project Manager . The Safety & <br /> Training Officer is responsible for the overall Health and Safety Program of Walton and <br /> may choose to audit any site for compliance and take appropriate action to correct <br /> deficiencies . The Project Manager is responsible for implementing the provisions of this <br /> SSP , providing a copy of this SSP to the field personnel , and advising personnel involved <br /> in site activities on health and safety matters . The Project Manager has the authority to <br /> audit site activities for compliance with the provisions of this SSP and may suspend or <br /> modify work practices or dismiss subcontractors whose conduct does not meet the <br /> requirements specified in this SSP . <br /> The Project Manager is responsible for the dissemination of the information contained in <br /> this SSP to Walton personnel assigned to the project , and to the responsible <br /> representative of each contractor/subcontractor firm working with Walton on the project . <br /> The Project Manager will act as the Site Safety Officer. As such , the Project Manager is <br /> responsible for adequately addressing the following items : <br /> • Safety supplies and equipment inventory onsite <br /> j . Proper communication of safety concerns <br /> • Traffic control and protection from the public . <br /> • Decontamination and contamination - reduction procedures <br /> The Project Manager has the authority to suspend work any time he or she finds that the <br /> provisions of the SSP are inadequate for worker safety . <br /> SAFETY AND ORIENTATION MEETINGS <br /> E <br /> Field personnel led by the Project Foreman will attend a project specific meeting for safety <br /> issues and review the project tasks before beginning work each day . Completion of a Job <br /> Safety Analysis (JSA) will be performed and will be reviewed , signed by all team members <br /> and updated periodically as conditions or the environment change throughout the day . <br /> 3900 Commerce Dr. , West Sacramento, CA 95691 Walton Engineering <br /> E' Walton =31010-465 .ssp 2 <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.