Laserfiche WebLink
Giottonini <br /> Page 2 <br /> 1740 Houston Avenue <br /> A revised work plan and permit application will be submitted next week. <br /> Fire Stations <br /> Work plans dated May 29, 1996 were submitted to P S/EHD on July 17, 1996. PHS/EHD stated that <br /> review of the plans was not completed, but that permit applications should be submitted. PHS/EHD <br /> indicated that some of the sites would not require the scope of investigation which were proposed and <br /> that PHS/EHD would prepare specific comments for each site and include any comments with drilling <br /> permits. <br /> 134 Sutter <br /> PHS/EHD stated that one soil boring, sampled approp ately, should provide sufficient information to <br /> evaluate the residual soil contamination which was ob rved by the PHS/EHD inspector on site at the <br /> time of the limited over-excavation. It was discussed at a slant boring or probing could be done <br /> instead of drilling in the Parking District's office. PH /EHD further indicated that if a permit <br /> application and revised work plan was submitted the m ork could be scheduled in conjunction with the <br /> work associated with the COS Fire Stations. <br /> The next meeting is scheduled for Tuesday, February 4, 1997 at 1:30 p.m. and will be held at the PHS/EHD <br /> office. <br /> Should you have any questions or disagree with this summary, please contact either Margaret Lagorio at (209) <br /> 468-3449 or Mary Meays at (209) 468-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Mary Meays, Senior REHSarg�areg.fi�REHS <br /> Site Mitigation Unit S apervisor <br /> MMICOS <br /> cc: Elizabeth Thayer, CVRWQCB <br /> cc: Jim Escobar, COS Public Works <br /> cc: Bob Murdoch, COS Public Works <br />