My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2825
>
3500 - Local Oversight Program
>
PR0545822
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 3:00:17 PM
Creation date
7/15/2020 1:16:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545822
PE
3528
FACILITY_ID
FA0005566
FACILITY_NAME
RIVERSIDE CEMENT COMPANY
STREET_NUMBER
2825
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
2825 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEA1 Th <br /> Riverside Cement C mpany <br /> Environmental Officer SEP 26 PIN Phone: (909)683-6458 <br /> . <br /> 1490 Rubidoux Boulevard •'Riverside;California 92509 Phone:(909)683-3660,ext.405 <br /> Mailing Address:P.O.Box 56040 • Riverside,California 92517 Fax/Voice Mail:(909)686-5703 <br /> September 16, 1994 <br /> Margaret Lagorio, Senior REHS <br /> Public Health Services <br /> San Joaquin County <br /> P. O. Box 2009 <br /> Stockton, CA 92501 <br /> RE: Riverside Cement StocktonGasoline Tank Site Closure <br /> Dear Margaret: <br /> After-reviewing=your April;8th, 1994;;letter.;and subsequent faxes=on'Aprii 11th; 1994;ywe <br /> have reviewed%the tankvclosure',4ithlBiltaHiuntet='-of>W lham�-J, Huriterrand Associates?in <br /> Sacramento and have decided to start closure as soon as possible. The schedule as we <br /> currently see it, is <br /> The closure work,plan:will be submitted to the County by October 1; 1994. <br /> 2. A.single-wellwillbe installed for monitoring within four (4) weeks after <br /> the above plan-is approved. <br /> 3. The initial report-will be issued-after sample analysis, within four (4) weeks <br /> of the well completion. <br /> 4. If the water.samples are "clean," the well'will be sampled again after a - <br /> thirty (30) day waiting period from the-date of the first sampling. <br /> 5. Within four.:(4) weeks of the second sampling, the final report-and request <br /> -for closure will be-issued: <br /> NOTE. If the.samples-show contamination,.resampling will be done..-All,of <br /> the sampling techniques. and tests chemical-requirements will be <br /> �Is <br /> pelled=out in the work plan submitted to you under#1: <br /> r ^� ;. c. ., -,_3 ,� f •.,r^ .{ {.. <br /> ..3.� „_�,. .€� .e t.�,• L �. .,.� :�vi. .€ f,t:•' ,=. ..- ": :YJi xr� G_i,..,orf.a c: .+:`._ <br /> If-all goes mell,,chis, naljreport could be in.,your=hands,m=February'or lVlarch:of 1995:' <br /> We have.-already-issued'a"Purchase -Order to Mv: Hunter"as of`September 9th:tw__roceed <br />
The URL can be used to link to this page
Your browser does not support the video tag.