My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009069
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2825
>
3500 - Local Oversight Program
>
PR0545822
>
ARCHIVED REPORTS_XR0009069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 2:50:59 PM
Creation date
7/15/2020 1:28:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009069
RECORD_ID
PR0545822
PE
3528
FACILITY_ID
FA0005566
FACILITY_NAME
RIVERSIDE CEMENT COMPANY
STREET_NUMBER
2825
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
2825 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM RCC Environmental Office PHONE NO 714 666 5703 PCtl <br /> AL. Riverside Cement Company <br /> Environmental Office Phony+ (909) 663-615a <br /> 1490 RUhidOUX 9Oul4vard ■ Riverside California 92500 Phone (949) G83 3660 eKt 405 <br /> Mailing Address P O 800 560410 • ft1Vdr$1d8 California 92S 17 f=ax/Voice Mail (909) GOO-3703 <br /> September 16, 1994 <br /> Margaret Lagono, Senior REHS <br /> Public Health Services <br /> San Joaquin County <br /> P O, Box 2009 <br /> Stockton, CA 92501 <br /> RE R.iveiside Cement Stockton Gasoline Tank Site Closuic <br /> Deai Margaret <br /> After reviewing your April 8th, 1994, letter and subsequent faxes on Apnl 11th, 1994, we <br /> have reviewed the tank closure with Bill Hunter of William J Hunter and Associates In <br /> Sacramento and have decided to start closure as soon as possible The schedule as we <br /> currently see it, is as follows <br /> 1 The closure work plan will be submitted to the County by Octol)er 1, 1994 <br /> 2 A single well will be installed for monitoring Lvithin four (1) weeks after <br /> the above plan is approved <br /> 3. The initial report wall be issued after sample analysis, within four (4) weeks <br /> of the well completion, <br /> water samples are 'clean," the well vw711 be sampled again aftei a <br /> (30) day witting penod from the date of the first sampling <br /> four (4) weeps of the second sampling, the final report and i equest <br /> sure will be issued <br /> If the sacriplts show (,UntdiriindtiUii, resampling will be dotie All of <br /> the Sampling techniques and tests chemical requii emcuts will be <br /> spelled out in the work plan submitted to you undc.i #1 <br /> It rillb"Ucd <br /> final report could be in your hands )n rei)ruai) vi Maich of 1995We a Pumhrsse Order to Mr hunter as of September 9th to proceed <br />
The URL can be used to link to this page
Your browser does not support the video tag.