My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012279
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2537
>
3500 - Local Oversight Program
>
PR0545857
>
ARCHIVED REPORTS_XR0012279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 7:57:38 PM
Creation date
7/15/2020 3:09:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012279
RECORD_ID
PR0545857
PE
3528
FACILITY_ID
FA0005147
FACILITY_NAME
E-Z FOOD
STREET_NUMBER
2537
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
11914035
CURRENT_STATUS
02
SITE_LOCATION
2537 WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1* <br />no <br />APCD The air sparge and associated vapor extraction system will continue to operate until the following <br />Groundwater Remediation Levels for benzene and MTBE are achieved <br />On-site soil remediation will be considered complete when either influent concentrations become <br />asymptotic, total influent VOC concentrations are less than 500 ppmv, or the following Soil Remediation <br />Levels for TPHg, BTEX and MTBE are achieved <br />Soil Remediation Levels SRLs <br />Constituent <br />Target Concentration m /k <br />TPHg <br />100 <br />Benzene <br />0 1 <br />Toluene <br />10 <br />Eth lbenzene <br />100 <br />Total X lents <br />100 <br />MTBE <br />10 <br />Groundwater Remediation Levels GRLs <br />Constituent <br />Target Concentration /L <br />TPHg <br />1,000 <br />- - F i;nzene - <br />10 <br />Toluene <br />150 <br />Eth lbenzene <br />700 <br />Total Xylenes <br />1,750 <br />MTBE <br />13 <br />10.4 Reporting <br />Remediation progress reports will be prepared quarterly and submitted to the regulatory agencies Each <br />report will detail remediation and monitoring activities conducted during the quarter and planned <br />activities for the next quarter The data collected each quarter will be presented in historical tables and <br />figures These Quarterly Remediation Progress Reports will be submitted within 30 days after the end of <br />each quarter <br />11.0 ASSUMPTIONS <br />• ATC will not be responsible for any unforeseen conditions <br />• ATC shall have unrestricted site access and will not be limited to specific working hours <br />• The protect schedules do not include allowance for delays or standby time due to inclement weather, <br />facility access restrictions or other factors beyond the control of ATC <br />• Nothing contained within this CAP shall be construed or interpreted as requinng ATC to assume the <br />status of a generator, transporter, storer, treater, or disposal facility as those terms appear within the <br />EZ 100966 CAP <br />S FEZ ServelEZ 1009661Reports1100966CAP <br />23 <br />ATC Associates Inc <br />ATC Project No 43 25827 0026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.