Laserfiche WebLink
1 <br />' Resource Conservation Recovery Act, 42 USCA, Section 6901 et seq _, as amended, or within any <br />state statute governing the treatment, storage, and disposal of hazardous waste <br />' ATC may recommend additional work This CAP may not include all work that will be recommended <br />based on the results of this project ATC will submit additional Workplan(s) in order to complete the <br />project as described in this CAP for this site <br />12.0 WORK SCHEDULE <br />' The scope of work proposed by this CAP includes the following soil and groundwater remediation <br />system engineering design, preparation of a remediation system installation bid package, remediation <br />' system installation, remediation system startup and operation and maintenance for one year <br />Other methods of remediation for this site include soil excavation and passive bioremediation (aka, <br />natural attenuation) Given the current situation of the site as an active business, excavation is not an <br />' economically feasible remediation alternative Though passive remediation is a proven method, this <br />method will not immediately address the hydrocarbon -impacted soil and groundwater <br />that the best choiLz '.`Cil al ''he silt- is 5 ii -r JL1 1-inui :0— <br />extraction <br />0 "extraction and air sparging system This CAP will be implemented upon receipt of written approval from <br />DEH The schedule of site remediation system installation activities is illustrated on Table 10, <br />Remediation Schedule <br />ale <br />EZ 100966 CAP ATC Associates Inc <br />S 1EZ ServelEZ 1009661Reports1100966CAP ATC Prolect No 43 25827 0026 <br />24 <br />