My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
3500 - Local Oversight Program
>
PR0545858
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 6:34:56 PM
Creation date
7/15/2020 3:15:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545858
PE
3528
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSB Envi,Vnmental <br />Consultants, Inc. <br />5740 East Shields Avenue, Suite 1103, Fresno, CA 93727 <br />May 13, 1992 <br />Mr. M. L. Ehrlich <br />WILD, CARTER, TIPTON & OLIVER <br />Attorneys at Law <br />246 West Shaw Avenue <br />Fresno, California 93704 <br />NOV 3'0 1992 <br />ENVIRONMENTAL HEALTH <br />PERM IT/5010 <br />RE: Cost Estimate for Monitoring Well Installation <br />i� <br />Beacon Cardlock Station No. 610 <br />3300 Waterloo Road <br />! <br />Stockton, California <br />'i <br />MAY 1 8 1992 <br />(209) 292-5736 <br />Dear Mr. Ehrlich: ! <br />As per your request, we are pleased to present the following cost estimate and project schedule <br />IL <br />for the preparation of a work plan, to conduct the proposed field work, and to prepare a final <br />report regarding Cardiock Station No. 610 in Stockton, California. if The cost estimate is based <br />on the use of a mobile auger equipped drill rig to drill three soil iborings, sampling at 5 foot <br />intervals. <br />•I <br />i <br />COST ESTIMATE <br />Quantity <br />Description <br />rE <br />Cost <br />Extended <br />1 each <br />Drilling Services <br />,i <br />$ 10,800.00 <br />$10,800.00 <br />28 hours <br />Field Geologist - Supervise Drilling and <br />fF 55.00 <br />1,540.00 <br />Sampling <br />8 hours <br />Two Person Team -Including Well <br />55.00' <br />440.00 <br />Development and Survey <br />21 each <br />Chemistry: BTXE and TPHg - Soil <br />�5 <br />;P 100.00, <br />2,100.00 <br />3 each <br />Chemistry: BTXE and TPHg - Water <br />100.001 <br />300.00 <br />3 each <br />Master Locks <br />7.60' <br />'p <br />22.80 <br />260 miles <br />Mileage <br />�! 0.35! <br />91.00 <br />4 hours <br />Travel <br />'E 55.001 <br />'k <br />220.00 <br />4 days <br />Per Diem <br />'I 75.06 <br />300.00 <br />16 hours <br />Report Preparation <br />( 55.00 <br />`i <br />880.00 <br />4 hours <br />Secretarial and Drafting <br />25.00 <br />100.00 <br />E Total: <br />S 16,793.80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.