My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
3500 - Local Oversight Program
>
PR0545858
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 6:34:56 PM
Creation date
7/15/2020 3:15:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545858
PE
3528
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ultramar <br /> Ultramar,Inc. Telecopy: 209=585-5685 Credit <br /> P.O.Box 466 209.583-3330 Administrative <br /> 525 W.Third Street 209-583-3302 Information Services <br /> Hanford,CA 93232-0466 209.583-3358 Accounting <br /> (209)582-0241 <br /> ENVIRONMENTAL PROJECT: <br /> QUARTERLY 'STATUS REPORT- <br /> DATE REPORT SUBMITTED: October 19, 1995 <br /> QUARTER .ENDING: September.'30, 1995. <br /> SERVICE STATION NO. : 610 <br /> ADDRESS: .3300 Waterloo -Road, Stockton, California <br /> COUNTY:yy•San Joaquin <br /> ULTRAMAR CONTACT: Kenneth R: Earnest TEL. NO: 209-583-5571 <br /> BACKGROUND <br /> Ultramar ,leased the site until July 1993. Four (4) <br /> ground-water monitoring wells had,.been .installed '.by the owners <br /> of the property. Ultramar installed- three . (3) more <br /> groundwater :monitoring wells -in early 1993. <br /> Three (3) underground storage tanks along with associated <br /> piping was removed -in mid-1993. <br /> Borings - were advanced to determine the extent of soil <br /> -contam.ination.' <br /> SUMMARY.-:OF THIS QUARTER'S ACTIVITIES: <br /> Groundwater monitoring was -performed August 7 and 25, 1995. <br /> RESULT OF UARTERLY MONITORING: <br /> 4 <br /> Groundwater samples did'.not exhibit'any 'detectable. BTEX or TPH <br /> as gasoline during the third quarter 1.995. However MW-1 and <br /> MW=6 . did'; exhibit -330' ppb - and- , 130 ppb- TPH as diesel , <br /> respectively (for the second sampling) . <br /> PROPOSED ACTIVITY OR WORK FOR NEXT QUARTER: <br /> ACTIVITY ESTIMATED COMPLETION DATE <br /> Discontinue quarterly. monito'ring <br /> If Submit SeSo,il December. 1995 <br /> BEACON <br /> A.Member of the Ultramar Group of Companies #1 Quality and Service <br /> Ufrramatr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.