My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 8:34:53 AM
Creation date
7/15/2020 4:46:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure 0 Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Gauge <br /> Tank ID UE020U001 <br /> Tank Manufacturer Modern Welding <br /> Tank Capacity 8,000 gallons <br /> Test Start Time 09:00 A.M. <br /> Initial Reading -10"hg <br /> Test End Time 10:00 A.M. <br /> Final Reading -10"hg <br /> Change in Reading 0.00° hg <br /> Pass/Fail Criteria Pass <br /> Tightness Test Results ❑✓ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ F2LJj <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑✓ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 0-10 P.S.I. Gauge <br /> Pipe Run ID UE020U001 Supply UE020U001 Return <br /> Pipe Manufacturer Total Containment Western Fiberglass <br /> Test Start Time 09:00 A.M. 09:00 A.M. <br /> Initial Reading 5 psi 5 psi <br /> Test End Time 10:00 A.M. 10:00 A.M. <br /> Final Reading 5 psi 5 psi <br /> Change in Reading 0 psi 0 psi <br /> Pass/Fail Criteria Pass Pass <br /> Tightness Test Results ❑✓ Pass ❑ Fail ❑✓ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID vent <br /> Pipe Manufacturer 4" Poly Rock Guard <br /> Test Start Time 09:00 A.M. <br /> Initial Reading 5 psi <br /> Test End Time 10:00 A.M. <br /> Final Reading 5 psi <br /> Change in Reading 0.00 psi <br /> Pass/Fail Criteria Pass <br /> Tightness Test Results ❑✓ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.