Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum p Hydrostatic <br /> Test Equipment Used: Fill Sump <br /> Sump/UDC ID DSL Fill Sump <br /> Sump Manufacturer Fiberglass <br /> Sump Depth (inches) 52" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 20" <br /> (inches) <br /> Test Start Time 09:00 A.M. <br /> Initial Reading 3.2532° <br /> Test End Time 09:15 A.M. <br /> Final Reading 3.2533° <br /> Change in Reading +0.0001 <br /> Pass/Fail Criteria Pass <br /> Tightness Test Results p Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID Piping <br /> Sump Manufacturer Fiberglass <br /> Sump Depth (inches) as° <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 17" <br /> (inches) <br /> Test Start Time 09:00 A.M. <br /> Initial Reading 2.9195° <br /> Test End Time 09:15 <br /> Final Reading 2.9196° <br /> Change in Reading +0.0001 <br /> Pass/Fail Criteria Pass <br /> Tightness Test Results El Pass ❑ Fail D Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />