My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:16 PM
Creation date
7/16/2020 8:57:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 3: CUT THE UPPER DROP TUBE <br /> Attach the supplied band clamp to the upper tube <br /> just below the mark and ensure that it is assembled <br /> square to the tube. The clamp can be used as a <br /> guide for making a square cut. If a vise is used, <br /> clamp on the valve body casting only to avoid Band Clamp <br /> damage to the float and tubes (See Figure 3A). <br /> Carefully saw through the tube squarely, at the mark <br /> made in Step 2. Use a hacksaw with a new fine- <br /> tooth blade. Rotating the upper tube as the sawing <br /> progresses will minimize run out and ensure a <br /> square 90-degree cut. Remove the band clamp <br /> after tube is cut. <br /> CAUTION -DO NOT use a pipe or tubing cutter to <br /> cut the upper drop tube, this may damage the tube, Cut Line <br /> causing it to be out of round thereby prohibiting Figure 3B <br /> assembly of the unit. <br /> STEP 4: FILE THE UPPER DROP TUBE <br /> IMPORTANT: Remove all chips and shavings File the upper tube square, and remove any burrs or <br /> generated in steps 3 thru 5 out of the cut end of the rough edges. Make sure the cut is flat and square. <br /> tube. DO NOT remove chips and shavings by <br /> dumping thru valve body. IMPORTANT: Carefully file a good chamfer on the <br /> inside edge of the drop tube to provide a lead-in for <br /> the polypak seal and inlet tube installed in step 8. <br /> Fine half round file <br /> Figure 3A <br /> Figure 4 <br /> 66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.